199 IAC 10.7
Renewal of permit.
10.7(1) A petition for renewal of an original or previously renewed pipeline permit shall be filed at least one year, and no more than five years, prior to the expiration of the permit. The petition shall be made on the form prescribed by the commission. Instructions for the petition are included as a part of the form, and the form is available on the commission's website. The petition shall include the information required by Iowa Code section 479.23 and paragraph 10.3(1)"d." The route map shall meet the requirements in paragraph 10.3(1)"b," except the existing pipeline route shall be provided instead of the proposed route and the information listed in subparagraph 10.3(1)"b"(6) is not required. The petition shall be considered filed with the commission on the date accepted into the commission's electronic filing system as provided for in 199-Chapter 14. The petition shall be attested to by an officer, official, or attorney with authority to represent the pipeline company.#
10.7(2) The procedure for petition for permit shall be followed with respect to publication of notice, objections, and assessment of costs.#
10.7(3) If there are unresolved issues of fact or law, or if an objection is filed within 20 days of the second publication of the published notice, the commission shall set the matter for hearing. If a hearing is not required, and the petition satisfies the requirements of this rule, a renewed permit will be issued upon the filing of the proof of publication required by rule 199-10.4(479).#
Source history[ARC 9348C, IAB 6/11/25, effective 7/16/25]#