Regulationcurrent
COMAR 20.55.09.08
Increasing Maximum Allowable Operating Pressure
Current as of source date Government source
Maryland Public Service CommissionOfficial agency material
View source A utility or gas master meter operator may not increase the maximum allowable operating pressure of a pipeline until it has submitted to the Engineering Division a copy of the written procedure required by 49 CFR §192.553(c), as amended, which is incorporated by reference.#