Incidentcurrent
DCA10MP007 docket item 19
Metallurgical Group- Picture 16 Metallurgical team members inspect the finish from early grit blasting of the ruptured pipe (piece b) at the NTSB Ashburn, Virginia facility.
Current as of source date
DCA10MP007 docket item 19
Docket item 19Metallurgical Group- Picture 16 Metallurgical team members inspect the finish from early grit blasting of the ruptured pipe (piece b) at the NTSB Ashburn, Virginia facility. DCA10MP007 docket item 19. 1 page. 0 photograph references. Published media type: Adobe PDF file. Metadata only; the linked docket file is not mirrored.#
This material provides agency context. It does not replace binding regulatory text, and its legal effect depends on the underlying authority and facts.