Incidentcurrent
DCA10MP007 docket item 21
Metallurgical Group--Picture 18 Sample sections are cut from the ruptured pipe piece at the NTSB Ashburn, Virginia Facility
Current as of source date
DCA10MP007 docket item 21
Docket item 21Metallurgical Group--Picture 18 Sample sections are cut from the ruptured pipe piece at the NTSB Ashburn, Virginia Facility DCA10MP007 docket item 21. 1 page. 0 photograph references. Published media type: Adobe PDF file. Metadata only; the linked docket file is not mirrored.#
This material provides agency context. It does not replace binding regulatory text, and its legal effect depends on the underlying authority and facts.