Incidentcurrent
DCA10MP007 docket item 165
Control Room and SCADA Operation - Figure 6: Line 6B Shutdown MBS Display on Feb. 1, 2012 Source: Enbridge Energy (NTSB: 351).
Current as of source date
DCA10MP007 docket item 165
Docket item 165Control Room and SCADA Operation - Figure 6: Line 6B Shutdown MBS Display on Feb. 1, 2012 Source: Enbridge Energy (NTSB: 351). DCA10MP007 docket item 165. 1 page. 0 photograph references. Published media type: Adobe PDF file. Metadata only; the linked docket file is not mirrored.#
This material provides agency context. It does not replace binding regulatory text, and its legal effect depends on the underlying authority and facts.