Incidentcurrent
DCA10MP007 docket item 166
Control Room and SCADA Operation - Figure 7: Simulated Line 6B Pipeline Display Leak on Feb. 1, 2012 Source: Enbridge Energy (NTSB: IR 351).
Current as of source date
DCA10MP007 docket item 166
Docket item 166Control Room and SCADA Operation - Figure 7: Simulated Line 6B Pipeline Display Leak on Feb. 1, 2012 Source: Enbridge Energy (NTSB: IR 351). DCA10MP007 docket item 166. 1 page. 0 photograph references. Published media type: Adobe PDF file. Metadata only; the linked docket file is not mirrored.#
This material provides agency context. It does not replace binding regulatory text, and its legal effect depends on the underlying authority and facts.