Incidentcurrent
DCA10MP007 docket item 167
Control Room and SCADA Operation - Figure 8: Simulated Unacknowledged Alarm Panel on Feb. 1, 2012 Source: Enbridge Energy (NTSB IR: 351).
Current as of source date
DCA10MP007 docket item 167
Docket item 167Control Room and SCADA Operation - Figure 8: Simulated Unacknowledged Alarm Panel on Feb. 1, 2012 Source: Enbridge Energy (NTSB IR: 351). DCA10MP007 docket item 167. 1 page. 0 photograph references. Published media type: Adobe PDF file. Metadata only; the linked docket file is not mirrored.#
This material provides agency context. It does not replace binding regulatory text, and its legal effect depends on the underlying authority and facts.