NTSB safety recommendation P-72-032.
THE NTSB RECOMMENDS THAT THE EQUITABLE GAS COMPANY: CONDUCT A FIELD INSPECTION OF EXISTING FACILITIES IT PLANS TO UPGRADE, REPLACE, REVAMP, RELOCATE, OR CHANGE, PRIOR TO COMMENCING THE REDESIGN.
Priority: CLASS II
Overall Status: Closed - Acceptable Action
Issued Date: 1972-06-08
Adopted Date: 1972-05-25
Overall Date Closed: 1975-12-30
Synopsis: ON NOVEMBER 17, 1971, WHILE IN THE PROCESS OF REVAMPING A REGULATOR STATION, EMPLOYEES OF THE EQUITABLE GAS COMPANY WERE ATTEMPTING TO REPLACE A VALVE ON THE LOW-PRESSURE SIDE OF A REGULATOR IN A VAULT WITHOUT FIRST STOPPING THE FLOW OF GAS. TWO MEN WORKING IN THE VAULT WERE OVERCOME BY GAS LEAKING INTO THE VAULT. FOUR OTHERS ALSO WERE OVERCOME ATTEMPTING TO RESCUE THE FIRST TWO. ALL SIX MEN DIED OF ASPHYXIATION. THREE OTHER MEN ALSO WERE INJURED.
Probable Cause: Inhalation of natural gas released into a vault where two men were attempting to change a valve in the vault without first stopping the flow of gas.
Ntsbnumber: PLD72XR004
Report Number: PAR-72-02
Addressee Name: Equitable Gas Company
Addressee Status: Closed--No Longer Applicable
Addressee Date Closed: 1975-12-30
Addressee Acronym: EQT
Addressee Organization Type: P-Private Industry
Communication Date: 1972-12-21
Communication Type: Official Correspondence
Communication Contents: LTR FROM EQUITABLE: FOR FACILITY INSTALLATIONS WHERE NO STANDARDIZED DESIGN CAN BE APPLIED, ENGINEERING FIELD INSPECTIONS ARE CONDUCTED FOR GATHERING INFORMATION APPLICABLE TO PRE-CONSTRUCTION DESIGN.
Addressee Acronym: EQT
Addressee Organization Type: P-Private Industry
Communication Date: 1978-06-09
Communication Type: Official Correspondence