P-73-046
P-73-046
NTSB safety recommendation P-73-046.
THE NTSB RECOMMENDS THAT THE ATLANTIC GAS LIGHT COMPANY: DEVELOP A SECTIONALIZING PROGRAM OF ITS HIGH-PRESSURE DISTRIBUTION SYSTEM SO THAT PREPLANNED PROCEDURES ARE AVAILABLE TO ISOLATE ANY SECTION OF ITS SYSTEM IN AN EMERGENCY.
Priority: CLASS II
Overall Status: Closed - Acceptable Action
Issued Date: 1973-08-24
Adopted Date: 1973-08-16
Overall Date Closed: 1976-07-20
Synopsis: A GAS EXPLOSION OCCURRED ON AUGUST 31, 1972 IN THE ANNEX BUILDING OF AN ATLANTA, GA., HIGH SCHOOL. GAS HAD LEAKED INTO THE BUILDING FROM A CRACKED CAST-IRON MAIN LOCATED BENEATH THE STREET IN FRONT OF THE ANNEX. ATLANTA GAS LIGHT COMPANY (AGL) PERSONNEL ARRIVED AT THE LEAK SITE APPROXIMATELY 1 HOUR AFTER AGL WAS FIRST NOTIFIED OF THE LEAK AND APPROXIMATELY 1/2 HOUR BEFORE THE EXPLOSION. ONE PERSON DIED AND SEVEN OTHERS WERE INJURED AS A RESULT OF THE ACCIDENT.
Ntsbnumber: PLD72XR005
Report Number: PAR-73-03
Addressee Name: Atlanta Gas Light Company
Addressee Status: Closed--No Longer Applicable
Addressee Date Closed: 1976-07-20
Addressee Acronym: AGL
Addressee Organization Type: P-Private Industry
Communication Date: 1974-07-12
Communication Type: Official Correspondence
Communication Contents: LETTER FROM ATLANTA GAS LIGHT COMPANY: THROUGHOUT THE HIGH-PRESSURE DISTRIBUTION SYSTEM A SUFFICIENT NUMBER OF VALVES HAVE BEEN INSTALLED TO ALLOW FOR ISOLATION OF A SPECIFIC SECTION OF THE SYSTEM IN EMERGENCY SITUATIONS. A PROGRAM IS UNDERWAY TO UPDATE OUR "CUT-OFF DISTRICT PLAN" TO PROVIDE PREPLANNED PROCEDURES FOR ISOLATING THE VARIOUS SECTIONS OF THE SYSTEM.
This material provides agency context. It does not replace binding regulatory text, and its legal effect depends on the underlying authority and facts.