P-74-027
P-74-027
NTSB safety recommendation P-74-027.
THE NTSB RECOMMENDS THAT THE MISSOURI PUBLIC SERVICE COMPANY: PROVIDE VALVE LOCATION AND OTHER NECESSARY INFORMATION TO DISPATCHERS IN RADIO CONTACT WITH SERVICEMEN, SUPERVISORS, AND REPAIR CREWS, SO THAT EMERGENCY EFFORTS CAN BE EXPEDITIOUSLY COORDINATED.
Priority: CLASS II
Overall Status: Closed - Acceptable Action
Issued Date: 1974-03-11
Adopted Date: 1974-02-27
Overall Date Closed: 1976-09-10
Synopsis: A gas explosion and fire occurred on December 9, 1972, in downtown Clinton, MO. Gas had leaked into a building from a cracked cast-iron main located behind the building. Missouri Public Service Company personnel arrived at the site of the reported leak 50 minutes before the explosion. Eight persons died, and seven others were injured.
Ntsbnumber: PLD73XR004
Report Number: PAR-74-03
Addressee Name: Missouri Public Service Company
Addressee Status: Closed--No Longer Applicable
Addressee Date Closed: 1976-09-10
Addressee Organization Type: P-Private Industry
Communication Date: 1975-02-25
Communication Type: Official Correspondence
Communication Contents: LETTER FROM MISSOURI PUBLIC SERVICE COMPANY: ALL OPERATING PERSONNEL RESPONSIBLE FOR RADIO CONTACT WITH SERVICEMEN, SUPERVISORS AND REPAIR CREWS ARE EQUIPPED WITH VALVE LOCATIONS AND OTHER NECESSARY INFORMATION SO THAT EMERGENCY EFFORTS CAN BE EXPEDITIOUSLY COORDINATED.
This material provides agency context. It does not replace binding regulatory text, and its legal effect depends on the underlying authority and facts.