NTSB safety recommendation P-78-004.
INSTALL A METER AT THE HESTINGS EXTRACTION PLANT ON THE INLET TO THE PROPANE PIPELINE TO DETERMINE HOW MUCH LIQUID IS ENTERING THE PIPELINE.
Priority: CLASS II
Overall Status: Closed - Acceptable Action
Issued Date: 1978-02-08
Adopted Date: 1978-01-12
Overall Date Closed: 1978-09-29
Synopsis: ON JULY 20, 1977, A 12-INCH PROPANE PIPELINE, OWNED BY THE CONSOLIDATED GAS SUPPLY CORPORATION, RUPTURED NEAR THE TOWN OF RUFF CREEK, PENNSYLVANIA. THE LIQUID ESCAPED FROM THE PIPELINE, VAPORIZED, AND PROPANE VAPORS SETTLED LIKE A FOG OVER THE BOTTOM OF A VALLEY. TWO MEN IN A PICKUP TRUCK ENTERED THE PROPANE CLOUD; THE TRUCK STALLED AND THE PROPANE GAS IGNITED WHEN AN ATTEMPT WAS MADE TO RESTART THE TRUCK. THE 2 PERSONS IN THE TRUCK WERE KILLED.
Ntsbnumber: DCA77MP027
Report Number: PAR-78-01
Addressee Name: Consolidated Gas Transmission Corporation
Addressee Status: Closed--No Longer Applicable
Addressee Date Closed: 1978-09-29
Addressee Organization Type: P-Private Industry
Communication Date: 1978-07-17
Communication Type: Official Correspondence
Communication Contents: CONSOLIDATED GAS SUPPLY CORP. LTR: A 2" ROTARY METER THAT MEASURES PRODUCT INPUT IN THE PIPELINE HAS BEEN INSTALLED ON THE DISCHARGE OF THE PUMPS AT THE HASTINGS EXTRACTION PLANT. THE SIGNAL FROM THE METER IS TRANSMITTED TO AND DISPLAYED ON AN ODOMETER IN THE CONTROL HOUSE AT HASTINGS EXTRACTION PLANT.
Addressee Organization Type: P-Private Industry
Communication Date: 1978-09-29
Communication Type: Official Correspondence