P-78-021
P-78-021
NTSB safety recommendation P-78-021.
INSTRUCT ITS EMPLOYEES TO RESPOND PRECISELY TO NOTICES OF PLANNED EXCAVATIONS PROVIDED BY ONE-CALL NOTIFICATION SYSTEMS.
Priority: CLASS II
Overall Status: Closed - Acceptable Action
Issued Date: 1978-07-06
Adopted Date: 1978-05-18
Overall Date Closed: 1983-02-28
Synopsis: ON DECEMBER 1, 1977, A 12-INCH, CAST-IRON HIGH-PRESSURE GAS MAIN OWNED BY THE ATLANTA GAS LIGHT COMPANY WAS RUPTURED BY AN 8-INCH STEEL I-BEAM PILE, WHICH WAS DRIVEN THROUGH THE PIPE AT A CONSTRUCTION SITE IN DOWNTOWN ATLANTA, GEORGIA. WITHIN MINUTES, NATURAL GAS AT 10-PSIG PRESSURE MIGRATED THROUGH THE GROUND, ENTERED SEWER LINES AND ELECTRIC CONDUIT SYSTEMS, AND SPREAD INTO NEARBY BUILDINGS. THE GAS DID NOT IGNITE, BUT THOUSANDS OF PEOPLE WERE EVACUATED FROM NEARBY OFFICE BUILDINGS.
Ntsbnumber: DCA78MP003
Report Number: PAR-78-03
Addressee Name: Atlanta Gas Light Company
Addressee Status: Closed--No Longer Applicable
Addressee Date Closed: 1983-02-28
Addressee Acronym: AGL
Addressee Organization Type: P-Private Industry
Communication Date: 1982-11-24
Communication Type: Official Correspondence
Communication Contents: ATLANTA GAS LIGHT COMPANY LETTER: THE ORIGINAL CUT-OFF DISTRICT IN DOWNTOWN ATLANTA WHERE THIS ACCIDENT OCCURRED WAS REVIEWED AND ACTUALLY DIVIDED INTO FOUR (4) SECTIONS IN ORDER THAT EMERGENCY CUT OFF COULD BE MADE IN A MORE EFFECTIVE MANNER. ATLANTA GAS LIGHT COMPANY HAS HAD A LOCATION SERVICE IN ATLANTA SINCE 1950 AND ALL OF OUR EMPLOYEES WHO WORK IN THIS AREA ARE INSTRUCTED TO INQUIRE ABOUT ALL ON-THE-JOB-SITE EXCAVATION TO BE DONE AT THAT LOCATION. IT IS OUR OPERATING POLICY TO REVIEW OUR EMERGENCY CUT-OFF DISTRICTS, KEEPING IN MIND THE NEED TO RE-DISTRICT OUR CONGESTED BUSINESS AREAS IF IT IS PRUDENT TO DO SO.
Addressee Acronym: AGL
Addressee Organization Type: P-Private Industry
Communication Date: 1982-10-08
Communication Type: Official Correspondence
Addressee Acronym: AGL
Addressee Organization Type: P-Private Industry
Communication Date: 1983-02-28
Communication Type: Official Correspondence
This material provides agency context. It does not replace binding regulatory text, and its legal effect depends on the underlying authority and facts.