P-78-076
P-78-076
NTSB safety recommendation P-78-076.
PROTECT PIPELINES TO BE CROSSED DURING CONSTRUCTION BY VERIFYING THE LOCATION, ELEVATION, AND DIMENSIONS OF ALL KNOWN OR SUSPECTED UNDERGROUND OBSTRUCTIONS AHEAD OF THE WORK AND BY REVIEWING ALL REQUIREMENTS IN THE SPECIFICATIONS WITH ITS FIELD SUPERVISOR.
Priority: CLASS II
Overall Status: Closed - Unacceptable Action
Issued Date: 1978-12-29
Adopted Date: 1978-12-07
Overall Date Closed: 1983-04-01
Synopsis: ON JUNE 12, 1978, A 10-INCH NATURAL GAS PIPELINE OWNED BY THE GAS SERVICE COMPANY WAS STRUCK AND RUPTURED BY EXCAVATION EQUIPMENT DURING CONSTRUCTION OF A SEWER IN KANSAS CITY, MISSOURI. THE NATURAL GAS ESCAPED FROM A 5-INCH-LONG HOLE IN THE PIPELINE. THE GAS IGNITED WHILE TWO GAS COMPANY EMPLOYEES WERE CLEANING THE PIPE WITH HAND TOOLS BEFORE INSTALLING A PIPE REPAIR CLAMP. BOTH MEN WERE BURNED SERIOUSLY.
Ntsbnumber: DCA78MP020
Report Number: PAR-78-05
Addressee Name: Torson Construction Company
Addressee Status: Closed--No Longer Applicable
Addressee Date Closed: 1983-04-01
Addressee Organization Type: P-Private Industry
Communication Date: 1983-04-01
Communication Type: Official Correspondence
Addressee Organization Type: P-Private Industry
Communication Date: 1982-10-08
Communication Type: Official Correspondence