NTSB safety recommendation P-83-034.
THE NTSB RECOMMENDS THAT THE EL PASO NATURAL GAS COMPANY: REVISE ITS EMERGENCY PLANT PLAN TO DESCRIBE THE VARIOUS POTENTIAL EMERGENCIES, TO EXPLAIN THE INTENDED USE AND OPERATION OF THE EMERGENCY SHUTDOWN AND BLOWDOWN FACILITIES, AND TO DELINEATE THE CIRCUMSTANCES UNDER WHICH THEY SHOULD BE ACTIVATED.
Priority: CLASS II
Overall Status: Closed - Acceptable Action
Issued Date: 1984-01-17
Adopted Date: 1983-12-12
Overall Date Closed: 1984-07-05
Synopsis: ON MAY 26, 1983, NATURAL GAS AT 815 POUNDS/SQUARE INCH GAGE (PSIG) BEGAN TO ESCAPE THROUGH A FAILED GASKET IN A COMPRESSOR AT THE EL PASO NATURAL GAS COMPANY'S BLANCO GASOLINE PLANT NEAR BLOOMFIELD, NEW MEXICO. THE COMPRESSOR STATION OPERATOR HEARD A LOUD NOISE, RAN TO THE VALVE MANIFOLD OUTSIDE THE COMPRESSOR BUILDING, AND TRIED TO SHUT OFF THE GAS SUPPLY TO COMPRESSOR NO. 14. ANOTHER EMPLOYEE, WHO ALSO HEARD THE NOISE, RAN INTO THE COMPRESSOR BUILDING AND TRIED TO SHUT DOWN THE COMPRESSOR ENGINE. BEFORE EITHER PERSON SUCCEEDED, THE ESCAPING GAS IGNITED, EXPLODED, AND BURNED. THE TWO EMPLOYEES WERE BURNED SEVERELY, ONE COMPRESSOR WAS DESTROYED, ANOTHER COMPRESSOR WAS DAMAGED, THE WINDOWS AND DOORS OF THE COMPRESSOR BUILDING WERE BLOWN OUT, AND OTHER STRUCTURAL DAMAGE RESULTED.
Probable Cause: The probable cause was the improper tightening of compressor head bolts, which caused a compressor head gasket to rupture and release natural gas that ignited; contributing factors were El Paso’s lack of proper bolt-tightening procedures and maintenance training, and inadequate emergency-procedure training that delayed blowdown and extended the emergency.
Ntsbnumber: DCA83MP019
Report Number: PAR-83-04
Addressee Name: El Paso Natural Gas Company
Addressee Status: Closed - Acceptable Action
Addressee Date Closed: 1984-07-05
Addressee Acronym: EPNG
Addressee Organization Type: P-Private Industry
Communication Date: 1984-03-02
Communication Type: Official Correspondence
Communication Contents: EL PASO NATURAL GAS COMPANY LETTER: ALL EMERGENCY PLANT PLANS WILL BE REVIEWED TO MAKE SURE THAT THEY CONTAIN PROPER INSTRUCTIONS THAT EXPLAIN THE INTENDED USE AND OPERATION OF ALL SHUTDOWN AND BLOWDOWN FACILITIES.
Addressee Acronym: EPNG
Addressee Organization Type: P-Private Industry
Communication Date: 1984-07-05
Communication Type: Official Correspondence