P-84-018
P-84-018
NTSB safety recommendation P-84-018.
THE NTSB RECOMMENDS THAT THE PLASTIC PIPE INSTITUTE: URGE ITS MEMBER COMPANIES TO COOPERATE WITH THE GAS RESEARCH INSTITUTE IN THE DEVELOPMENT OF NONDESTRUCTIVE EQUIPMENT TESTING CAPABLE OF DETECTING INADEQUATELY FUSED BUTT, SADDLE, AND SOCKET FUSION JOINTS IN THE FIELD.
Priority: CLASS II
Overall Status: Closed - Unacceptable Action
Issued Date: 1984-06-15
Adopted Date: 1984-05-17
Overall Date Closed: 1989-04-19
Synopsis: ON JULY 12, 1983, NATURAL GAS ESCAPING UNDER 60 POUNDS PRESSURE FROM A CRACK IN A BUTT FUSION JOINT IN A 2-INCH PLASTIC GAS MAIN ENTERED AN APARTMENT BUILDING IN CLEAR LAKE, IOWA, EXPLODED, AN THEN BURNED. TWO INTERSTATE POWER COMPANY EMPLOYEES WERE INJURED, ONE APARTMENT BUILDING WAS DESTROYED, AND THE ADJACENT APARTMENT BUILDING WAS DAMAGED HEAVILY. DAMAGE WAS ESTIMATED AT MORE THAN $1 MILLION; NONE OF THE RESIDENTS WERE INJURED OR KILLED.
Probable Cause: None
Ntsbnumber: DCA83MP022
Report Number: PAR-84-02
Addressee Name: Plastics Pipe Institute
Addressee Status: Closed - Unacceptable Action
Addressee Date Closed: 1989-04-19
Addressee Acronym: PPI
Addressee Organization Type: A-Associations
Communication Date: 1988-06-07
Communication Type: Official Correspondence
Addressee Acronym: PPI
Addressee Organization Type: A-Associations
Communication Date: 1989-04-19
Communication Type: Official Correspondence
This material provides agency context. It does not replace binding regulatory text, and its legal effect depends on the underlying authority and facts.