P-86-006
P-86-006
NTSB safety recommendation P-86-006.
THE NTSB RECOMMENDS THAT THE ALABAMA GAS CORPORATION: DEVELOP, IN COORDINATION WITH LOCAL EMERGENCY RESPONSE AGENCIES, A SYSTEM INDEPENDENT OF THE TELEPHONE TO NOTIFY WITHOUT DELAY FIRE, POLICE, OR OTHER LOCAL SAFETY OFFICIALS ABOUT EMERGENCY CONDITIONS AT ITS NATURAL GAS LIQUEFACTION PLANTS.
Priority: CLASS II
Overall Status: Closed - Acceptable Action
Issued Date: 1986-04-17
Adopted Date: 1986-03-22
Overall Date Closed: 1987-05-14
Synopsis: ABOUT 10:50 A.M., ON AUGUST 22, 1985, LIQUID METHANE WAS BEING DRAINED FROM THE COLD BOX INTO A VERTICAL ALUMINUM TANK 3 FEET IN DIAMETER AND 7 FEET TALL (VESSEL 17.23A) AT THE ALABAMA GAS CORPORATION'S (ALAGASCO) NATURAL GAS LIQUEFACTION PLANT IN PINSON, ALABAMA. THERE WAS NO PRESSURE GAUGE ON THE TANK. SHORTLY AFTER THE LIQUID METHANE BEGAN ENTERING VESSEL 17.23A, THE WELD ATTACHING AN 8 1/4-INCH BY 12-INCH ALUMINUM PLATE THAT WAS BEING USED TO COVER A HOLE THAT HAD BEEN CUT IN THE SIDE AT THE BOTTOM OF VESSEL 17.23A FAILED. THE PRESSURE WITHIN THE TANK PROPELLED THE PLATE 24 FEET AWAY INTO A BUILDING WHICH HOUSED A CONTROL ROOM, A BOILER ROOM, AND OFFICES. SOME OF THE WINDOWS IN THE CONTROL ROOM WERE BLOWN INWARD, AND METHANE ESCAPING FROM THE OPENING IN VESSEL 17.23A ENTERED THE BUILDING, WHERE IT WAS IGNITED BY ONE OF SEVERAL AVAILABLE IGNITION SOURCES. SIX PERSONS WERE INJURED, AND DAMAGE TO THE PLANT WAS ESTIMATED TO BE MORE THAN $1 MILLION.
Probable Cause: None
Ntsbnumber: DCA85FP018
Report Number: PAR-86-01-SUM
Addressee Name: Alabama Natural Gas Company
Addressee Status: Closed - Acceptable Action
Addressee Date Closed: 1987-05-14
Addressee Acronym: Alagasco
Addressee Organization Type: P-Private Industry
Communication Date: 1986-06-16
Communication Type: Official Correspondence
Communication Contents: AN EMERGENCY RESPONSE SYSTEM INDEPENDENT OF THE TELEPHONE WILL BE INSTALLED WITHIN THE PLANT AND ANOTHER WILL BE INSTALLED OUTSIDE THE PLANT FENCE WITH A DIRECT LINE TO THE CENTER POINT AND BIRMINGHAM FIRE DEPARTMENTS. THE SYSTEM, UPON ACTIVATION, WILL NOTIFY THE FIRE DEPARTMENT OF EMER GENCY CONDITIONS AT THE NATURAL GAS LIQUEFACTION PLANT. P-86-6 IS SCHEDULED TO BE IN COMPLIANCE BY 9/18/86.
Addressee Acronym: Alagasco
Addressee Organization Type: P-Private Industry
Communication Date: 1987-01-28
Communication Type: Official Correspondence
Communication Contents: THE EMERGENCY RESPONSE SYSTEM HAS BEEN INSTALLED AND IS OPERABLE. THE SYSTEM USES HAND-HELD RADIO TRANSMITTERS WHICH THE OPERATORS WEAR CONTINUOUSLY WHEN ON DUTY, AND WILL TRANSMIT A SIGNAL FROM ANYWHERE WITHIN THE PLANT AREA TO AN EMERGENCY RESPONSE FROM THE FIRE DEPT., PARAMEDICS, AND POLICE DEPT. AN ADDED FEATURE IS THAT IN THE EVENT OF AN EXPLOSION IN THE CONTROL ROOM SUCH AS OCCURRED IN THE 8/22/85 ACCIDENT, THE EMERGENCY RESPONSE CONTRACTOR WILL BE NOTIFIED AUTOMATICALLY. THE SYSTEM IS SELF-CHECKING AND IS THEREFORE ALWAYS OPERABLE.
Addressee Acronym: Alagasco
Addressee Organization Type: P-Private Industry
Communication Date: 1987-05-14
Communication Type: Official Correspondence
Addressee Acronym: Alagasco
Addressee Organization Type: P-Private Industry
Communication Date: 1986-09-22
Communication Type: Official Correspondence
This material provides agency context. It does not replace binding regulatory text, and its legal effect depends on the underlying authority and facts.