P-82-047
Page 1Official PDFa -q, YL NATIONAL TRANSPORTATION SAFETY BOARD 3 WASHINGTON, D.C. I S S L , E D : December 10, 1982 ------------________I___________________----." Forwarded to: Mr. Phillip Lathrop, Chairman American Society of Mechanical Engineers Gas Piping Standards Committee c/o Pacific Gas and Electric Company 77 Beale Street San Francisco, California 94106 SAFETY RECOMMENDAT I O N ( S ) P-82-47 __ At 1050 a.m., e.d.t., on September 7, 1982, natural gas, blowing a t 15 psi? from the open ends of a 2 ll4-inch cast-iron gas main located in a deep, narrow excavation a t the intersection of Cooper and Marshal Streets in Dublin, Georgia, was ignited by an unknown source. Three City of Dublin gas department employees who were working in the excavation were critically burned. The acting silperintendent of the gas department, who was standing a t the edge of the excavation, helped the injured out of the ditch and was seriously burned in the process. The City of llublin, population 16,000, owns and operates a gas distribution systcrri serving 3,900 customers in the city and surrounding areas. Six full-time gas department employees operate and maintain the system: an acting superintendent, a foreman, two equipment operators, and two laborers. The Dublin gas department receives its nalturfil gas from the Southern Natural Gas Company at two town border stations. On September 7, 1982, a private contractor working for the city was installing an 18-inch concrete drain pipe under and across Cooper Street a t its intersection with Marshal Street. The contractor requested that a section of fi-inch plastic water line and a section of 2 1/4-inch cast-iron gas main under Cooper Street be lowered since the drain pipe was to be installed a t the depth at which these two facilities were currently located. To lower the gas main in this area, the gas department decided to cut out an 11-foot section of the pipe, deepen the excavation 2 feet, and install a Ifi-foot-long piece of 1 ll4-inch plastic pipe with an adapter at each end as a temporary gas line to pass below the 18-inch concrete drain. The excavation would then be partially filled so that t h e 18-inch concrete drain could be installed 3 feet above the temporary gas line. A t 8:15 a.m., t h e gas department's crew unloaded a backhoe a t the site and proceeded to expose the gas main. The crew then deepened the excavation an additional 2 feet below the gas main for the installation of the temporary connection. The gas main was then cleaned to prepare it for cutting and removing the 11-foot section of pipe. Gas department trucks were parked in the street intersection and around the excavation site to act as a traffic barrier; however, the area was not cordoned off nor were any warning signs posted. Portable hand-held, dry chemical fire extinguishers were on the trucks but were not readily accessible at the edge of the excavation. No air breathing equipment was on hand nor were any safety belts and ropes readily available for the emergency retrieval of persons from the excavation. 3628#
Page 2-2- When the two workers had finished cleaning the pipe, the acting superintendent and the forernan asked them if they wanted the gas main isolated by valve closure and then purged so that the main could be cut without being under pressure. The two workers elected to cut the gas main under 15 psig; they had done this several times in the recent past without incident. Valve books showing the location of all the isolation valves in the system were in the trucks but were not used a t this time. A review of the valve books after the accident showed that closing three valves, one within 2 feet of the excavation and the other two one block away from the excavation, would have isolated the involved section and would have cut off service to only one customer. A t 10:45 a.m., using a three-wheeled hand operated pipe cutter, the two workers completed the first cut on the gas main at the south end of the excavation. The worker quickly shifted the pipe cutter to the north end of the excavation and cut the pipe Gas was escaping under pressure, but the cut section of pipe remained in position b it was in compression. Another worker, standing a t the edge of the excavation, the cut section and it fell to the bottom of the ditch. Blowing gas, dust, and filled the ditch. The two other workers in the ditch quickly attempted to connect the plastic replacement section to the gas main using pre-positioned clamps a t each end of the open gas main. The workers first attached the replacement section to the north end of the gas main and began tightening the bolts on the clamp. A t 10:50 a.m., as the workers were positioning the other end of the pipe to the gas main, the gas ignited and fire burned from both ends of the open gas main. The three workers in the ditch, their clothes on fire, crawled out of the ditch or were helped out by the acting superintendent. The forernan, who was then across the street, ran back to the site and a t 10:52 a radioed the city fire department and requested ambulances and assistance. The department arrived at 10:54 a.m. and was followed by the police depa ambulance a t 10:56 a.m. The four injured workers were taken to the local hospital for examination. Three of the workers were listed in critical condition and were transported by helicopter to a burn treatment center in Augusta, Georgia. The acting superintendent was hospitalized locally in serious condition. Fire continued a t the accident site with flames 18 feet high across the entire excavation. The foreman and a former gas department superintendent, who had been summoned because he was familiar with the gas system and because they now lacked experienced help, arrived with the police and proceeded to close valves to shut off the gas still fueling the fire. The valve located within 2 feet of the north end of the excavation which was one of the three valves which could have been closed to isolate the area initially could not be reached because of the intense heat and flame. The foreman and former superintendent, therefore, closed the second line of six valves located in a block area around the accident site. The closure of the six valves affected only s customers; four of the customers used gas only for heating, and their furnac for the summer. Although the precise time of closure was not noted, all valves wer closed within IO minutes and the fire burned out about 11:30 a.m. Late procedures were initiated and all customer services were restored a t 7 p.m 2 1/4-inch gas main was isolated within one block and no customers were affec isolation. The Safety Board is concerned that the practice of cutting gas mains under in other than emergency conditions, involves undue risks and that the D deoartment failed to follow reauired safetv oractices. The Safetv Board is al t h k this is not an isolated problem in one small gas distribution" system. The Boa investigated 48 pipeline accidents involving small operators, both municipall#
Page 3-3- privately owned, wherein similar problems of operation and maintenance were involved. Therefore, the National Transportation Safety Board recommends that the American Society of Mechanical Engineers, Gas Piping Standards Committee: Revise the American Society of Mechanical Engineers Gas Guide provided for compliance with Part 192.751, Prevention of Accidental Ignition, of Title 49, Code of Federal Regulations, to advise against cutting gas mains under pressure unless specific conditions can be identified wherein such a practice can be performed safely. If such conditions exist, identify them in the guide and describe the safeguards necessary for safely cutting gas pipelines under pressure. (Class II, Priority Action) (P-82-47) BURNETT, Chairman, GOLDMAN, Vice Chairman, McADAMS, RURSLEY, and ENGEN, Members, concurred in this recommendation. B U J i m Burnett Chairman#
This is an NTSB safety recommendation letter. NTSB recommendations are advisory and do not themselves create binding regulatory requirements.