Page 1Official PDF- . - NATIONAL TRANSPORTATION SAFETY BOARD WASHINGTON, D.C. 1 iP- 2 0 P J2 3 ISSUED: March 24, 1983 Mr. G. H. Lawrence President American Gas Association 1515 Wilson Boulevard Arlington, Virginia 22209 \ SAFETY RECOMMENDAT I ON (S) P-83-10 L_ On October 29, 1982, Washington Gas Light Company dispatched a three-person crew, consisting of a crew leader, a crew mechanic, and a helper mechanic, to make three service line extensions in a new housing development at Burke, Virginia. The extensions were to be made without shutting off the flow of gas in the main. About 10:30 a.m., the crew arrived at the work site and connected the service line for residence No. 10027 (see figure 1) to an existing service line stub. After making this connection, the crew was to install a branch service line to residence No. 10023 from the service line connected to the house next door, No. 10025. Using hand tools, a hole 30 inches deep was excavated to expose the plastic service line. The service line was cut, and the end of the service line segment which contained gas under pressure was sealed with a cap. The installation required that a branch tee connection be installed in the service line to No. 10025 to allow No. 10023 to be served from the same service line. A check of the service truck disdaed that the appropriate compression tee was not available at the job site; by radio, the crew leader called the foreman and advised him that a branch tee was needed. While waiting for the requested fitting, the crew began work at residence No. 10002. When the foreman arrived with the branch tee, the crew mechanic volunteered to install the tee on the service line to No. 10025. Neither the foreman nor the crew leader advised against this action, and the crew leader and helper mechanic continued working at residence No. 10002. After a few minutes, the crew leader looked up and did not see the crew mechanic. H e walked to No. 10025 and found the crew mechanic face down inside the excavation with gas escaping at 1 8 psig from the service line. He pulled the crew mechanic Erom the excavation and tried to revive him by calling his name and slapping his face. When this action did not revive the crew mechanic, the crew leader ran to his truck and called the gas company dispatcher. Meanwhile, the helper mechanic arrived at the excavation site. Both the crew leader and the helper mechanic had attended company cardiopulmonary resuscitation (CPR) training, but neither attempted to use this means to revive the crew mechanic. About 4 to 5 minutes later, a rescue squad arrived and, after attempting to revive the crew mechanic, transported him to the hospital, where he was declared dead. After removing the crew mechanic from the excavation, the crew leader and helper mechanic noticed that the compression tee was partially installed. One downstream connection was completed; the other downstream connection had been made, but the retaining n u t w a s only hand-tight. The upstream connection had not been made, and the cap had been removed from the portion of the service line under pressure. Company 3678#
Page 2-2 ._ procedures allow work to be performed on lines containing gas under pressure, and for installation being undertaken, a pressure up to 55 psig was permissible. Compa procedures also require that (1) as a means to reduce the time an employee works in a hazardous environment, the nonpressur the line under pressure is removed performing work on lines containing gas present, with one observing the work and av work if necessary. Company records reflect that each crewmernber had receive on-the-job and classroom training sufficient to qualify him to perform his ass in accordance with company procedures. The company evaluates the effectiv classroom training through an employee testing program. Employee actions in this accident demonstrate that these crewmember follow company procedures and did not apply training received -- (1) the crew mechanic both failed to comply with the requirement that two employees be present when working on lines containing gas under pressure; (2) the crew mechanic did not follow explicitly the installation procedures for installing the compression tee; and (3) neither the crew leader nor the helper mechanic attempted to revive the crew mechanic by employing CPR techniques. This death could have been prevented had a second employee been present while the compression tee was being install may have been prevented had the compression tee installation proc explicitly. Accordingly, the National Transportation Safety Board recommend American Gas Association: Notify its member companies of the circumstances of this accide urge them to emphasize to their supervisory personnel the need for adherence to established company safety procedures. ( Action) (P-83-10) The National Transportation Safety Board is an independent F statutory responsibility 'I... to promote transportation safety by conducting independent accident investigations and by formula (P.L. 93-633). The Safety Board is vitally our safety recommendations. Therefor regarding action taken or contemplated w BURNETT, Chairman, GOLDMAN, Vice Chairman, and McADAMS, BUENGEN, Members, concurred in this recommendation.#
Page 3STUB LOT 37 #10027 NOT OCCUPIED 34" PLASTIC SERVICE LINE 2" PLASTIC MAIN LOT 36 #10025 OCCUPIED 21 PASTIC FUSION TEE 7029-0 TO OCCUPIED HOUSE FROM GAS MAIN (HAND TIE) 13° EXCAVATION DISTA %" PLASTIC SERVICE LINE FIGURE 1. PLAN VIEW OF ACCIDENT SITE COMPRESSION TO NEW HOUSE (WRENCH TIE) PARK WOOD LANE LOT 35 #10023 NOT OCCUPIED 417° - REDUCER NOT TO SCALE TO OCCUPIED HOUSE FROM GAS MAIN LOT 56 #10002 NOT OCCUPIED 3" PLASTIC MAIN 7" PLASTIC $ SERVICE LINE TO NEW HOUSE - EXCAVATION - STUB#
This is an NTSB safety recommendation letter. NTSB recommendations are advisory and do not themselves create binding regulatory requirements.