Page 1Official PDFNational Transportation Safety Board Washington, D. C. 20594 Safety Recommendation Date: May 1, 1992 In Reply Refer To: P-92-14 Honorable H. Lawrence Garrett 111 Secretary of the Navy The Pentagon Washington, D.C. 20350-1000 On December 9, 1990, a gas system valve between one of Fort Benjamin Harrison's gas distribution systems and a discontinued steel gas system segment was inadvertently opened, allowing natural gas to enter residential buildings that had reviously received their gas from the discontinued segment Gas accumulating in Euilding 1025 of Harrison Village was ignited by one of many available sources, such as electrical switches and appliances, and the resulting explosion killed 2 occupants and injured 24 other persons One building was destroyed, and t w o were damaged 1 The National Transportation Safety Board determines that the probable cause of the natural gas explosion and fire at Fort Benjamin Harrison was the failure of the Army to construct, maintain, and operate the Fort's gas distribution system in accordance with its own and the industry'sstandards. The result was the inadvertent opening of a valve to a discontinued steel gas main that allowed natural gas to leak into a residential building, where it ignited and exploded The provisions of the Army'sTM 5-654 (its maintenance and operation manual) were not followed at the Fort. The lack of adherence is evident from the difficulties the Corps representative had in locating valves during the oas system modilications, the inadequacies of the cas system maps, the failure of the utilities branch t o periodically inspect the system for leaks and corrosion, the lack of gas system maintenance and documentation, and the fact that many DIS employees had never heard of the manual 1 For more detailed information, read Pipeline Accident Report--"Natural Gas Explosion and Fire, Department of Defense/Army, Fort Benjamin Harrison, Indianapolis, Indiana, December 9, 1990" (NTSBIPAR-9210 1) 543 16#
Page 22 The failure of the Fort's management to carry out the Army's maintenance and operating procedures coritribut.ed to the difficulty of locating valves to isolate the leaking segment of pipeline and, after the as system modifications, t o leaving closed the two accessible valves adjacent to t 7l e east end of building 1026. If the required quarterly valve inspections and semiannual maintenance had been properly conducted, the inaccessible main line valve behind building 1026 could have been identified, and the problem might have been corrected long before the gas system modifications were begun. Also, during annual inspections of the gas system, the numerous deficiencies in the maps could have been discovered and brought to the attention of the Fort's management.. Documentation of the maintenance, repair, and modification of a gas system is essential to safe operations,. The lack of documentation about the villa e system indicates that the Fort management was not assessing the condition o f t x e system and determining the need for modifications and improvements. A pressure test and leakage survey done after the explosion revealed at least three leaks in the newly installed system,. That the fire department had responded t o 20 reports of gas leaks within 18 months should have been a warnin that the village system was deteriorating arid that the threat to the safety o f t 8 e residents was increasing,. Had the fire department management discussed with the DIS director the frequent gas leaks in the village, the discussion might have prompted an overall review of the village gas system that could have revealed the many deficient operating arid maintenance conditions,, The maintenance and mapping deficiencies at the Fort were longstanding and were not brought to the attention of Army management before this accident, in part, because inspections were riot being performed by knowledgeable persons independent of the Fort's management. State or Federal personnel inspect gas systems that are subject t o DOT re ulations, and deficiencies identified must be corrected,. Gas operators can be or 3 ered to correct specific faults and may also be fined or otherwise penalized. The DOD needs to annually inspect its gas systems using qualified personnel and establish incentives that will induce military- installation management to comply with all provisions of the current maintenance and operation manual. The Corps' specifications about the design, construction, and testing of gas pipeline systems a t the time the modifications were made to the village gas system were incomplete and did not reflect current industry practices. The deficient specifications allowed the contractors to design and construct safety-critical facilities without. proper regard for safety,. Had Corps personnel been knowledgeable about industry practices, they would have been able t o establish requirements for the proper abandonment of pipe, procedures for plastic pipe joining, qualifications for people who perform and inspect pipe joining, and the maximum operating pressure for pipelines. The Guide Specifications o f Military Family Housing, which was applicable t o the design and construction of the village modifications, was even less specific about the design of gas system modifications. (This guide was canceled by the DOD in June 1990, before the accident..) Consequently, the architect had considerable design freedom and was not required to produce a roposal that adequately addressed specifications for the gas system,. Also, the arc R . itect apparently was not current inhis knowledge of gas system design,, His specifications allowed the use of cast-iron pipe, which is no longer used by the industry; called for the installation of drips, which are not required on systems transporting dry natural gas; did not permit the#
Page 33 use of plastic pipe, which has long been the primary material used by the industry; and did not require proper abandonment of discontinued gas pipes. The Corps' review of the architect's Phase I specifications and installation drawings, which included the gas system specifications, was cursory at best.. The Corps could reasonably have been expected to check the architect's specifications to ensure that applicable safety requirements had been incorporated; however, no one at any stage of the review process identified that the architect needed t o add abandonment requirements to his specifications. The Corps had a second opportunity to improve the specifications.. When the contractor substituted plastic for the pipe materials specified by the architect, the Corps should have then included plastic-pipe construction experience requirements for the contractor who installed the plastic pi e, required the contractor to qualify through tests the plastic fusion procedure to E e used, required the qualification of the contractor's employees who made plastic fusion joints, and established the test pressure for the plastic system by specifyin its maximum operating pressure. Additionally, the Corps should have require 3 that i t s construction inspector be trained in inspecting plastic piping systems, including the making of fusion joints., The Corps also reviewed the architect's Phase II specifications and, a ain, did not ask for any changes., The Corps took no exception to the architect's 3. allure to specify the tie-in locations, t o the lack of explicit specifications for the plastic pipe (the lack of which later permitted the contractor to select material that was incompatible with the pipe used in the Phase I construction), or to the fact that the locations of the Phase I piping and existing valves were not shown. The Corps did not analyze the effect of the proposed modifications on the village gas distribution system. Consequent1 , it did not recognize that the modifications violated the Army requirements t t: at isolation valves be installed on main loops to minimize disruptions. The Corps also failed to realize that the corrosion control system for the steel pipe would be disrupted by the addition of sections of plastic pipe., However, the most serious consequence of not analyzing the effect of the modifications on the village system was the failure to recognize the importance of main tie-in locations. Depending on which map was used, a proper specify analysis s ould have identified that the tie-in adjacent to buildings 1026 and 1027 should have been located just west of the open valve shown behind building 1026. This would have continued the usefulness of the three valves adjacent to the east end of building 1026 as isolation valves, and it would have necessitated the physical separaiicm from the gas system of the discontinued steel main behind buildings 1023 through 1026. The Phase II piping should have bw,i tied into the steel main, not into the Phase I plastic main. Excavating the area to make the tie-in probably would have exposed the buried open valve, revealing a hazard that required correction. A system analysis would probabl have also uncovered some of the mapping errors made over the years and the Y act that valves were no longer being numbered as required by TM 5-654.. Either finding should have prompted a more detailed investigation to determine the true locations of the mains and valves. The Corps assigned only one inspector to each modification phase.. The inspector was responsible for overseeing all work t o be completed under the contract, including the installation of the gas system modifications. Neither#
Page 44 inspector had experience in constructing gas systems, and the Corps had provided no training for them. Even had the inspectors recognized the need t o install the gas system differentlk ,they would not have been able to force the contractor to alter his work. Their aut or1t.y was limited to requiring adherence to those provisions explicitly stated in the contract. Because of the contract's lack of specificity and the inspectors' lack of experience, the contractors were able to construct the gas system as they wished with little or no uidance from the Corps. However, the Corps' inspectors could have, and the Sa 3 ety Board believes the should have, brought to Y the attention of their management any issue affecting sa ety that they were unable to resolve. On August 13,1991, theengineering division chief of the Army's Directorate of Military Programs advised the Safety Board of the following: military housing specifications could no longer be used as standards for desi riing or constructing pipeline systems; the Corps design and construction specitcations for pipeline systems had been modified to include applicable provisions of the Federal DOT requirements and of industry-consensus standards, including provisions for abandoning pipe and for qualifying persons who join pipe; and those provisions were now part of any contract that included the construction of gas systems.. The Corps has also made procedural changes that should improve the quality of gas system designs.. To avoid the fragmentation of utility system installation or modification, it now recommends that phased construction projects include in the first phase all necessary modifications to the-gas and other utility systems. It also recommends the removal of all abandoned gas pipe,. The Corps evaluated its control and quality assurance programs on design projects. It found that each quality assurance team consisted of several junior or journey-level engineers and a senior engineer in each discipline who may or may not have had extensive experience. The Corps concluded that appropriate design experience i s required for effective review and that assignment to a quality assurance team is not appropriate training for young, inexperienced engineers. The Corps determined that the team should include only experienced engineers, who would already have been exposed to various design solutions, and that maximum synergistic effects could be achieved by the rotation of experienced en ineers between design and review responsibilities. The Corps also determined t 8 at the procedures being used in preparing contracts and defining the scope of design services were significantly out of date. Furthermore, often the procedures were not followed. The Army's gas pipeline safety management program is not unique among the military services. Analogous to the Secretary of the Army, the Secretary of the Navy delegates the responsibility for designing and constructing the Navy's approximate 135 gas systems to t.he Navy's engineering command, which is the Naval Facilities Engineering Command. The Air Force has not developed an internal engineering capability for gas system design; it uses the services of the Army and Navy t o support its 83 gas systems. Also, like the Army, the Navy and the Air Force delegate day-to- day management of support operations, including gas pipeline systems, t o installation commanding officers. On October 22, 1991, Safety Board staff met with Navy managers responsible for gas safety. They discussed the Navy's gas system policies, including those relating \#
Page 55 t o design, construction, operation, maintenance, emergency preparedness, employee qualifications and experience, and the selection of design and construction contracts. The group also discussed the Fort‘s problems with system modifications and with emergency responses. The Navy managers acknowledged that the Army and Navy have similar gas system procedures. Such similarities and common elements, in light of the safety problems identified as a result of this investigation, raise concerns about the adequac of Navy and Air Force gas system safety programs. Consequently, the Safety Boar J believes that the Secretaries of the Navy and Air Force also need to assess the adequacy of their gas pipeline systems and their safety oversight programs. In addition, military gas system personnel could benefit from all of the gas system programs, conferences, technical documents, and training that are available through gas industry associations and State and Federal agencies., Therefore, the National Transportation Safety Board recommends that the Secretary of the Navy: Evaluate the Navy’s gas pipeline program t o identify and correct any deficient design, construction, operation, and maintenance procedures; inspect Navy gas pipeline systems to identify and correct any conditions that do not comply with Navy gas pipeline system policies and practices; and, if necessary, implement a program for periodically assessing compliance at all command levels with Navy as pipeline safety policies and standards. (Class II, Priority ActionT(P-92-14) The National Transportation Safety Board is an independent Federal agency with the statutory responsibility “to promote transportation safety by conducting independent accident investigations and by formulating safety improvement recommendations” (Public Law 93-633). The Safety Board is vitally interested in any action taken as a result of i t s safety recommendations., Therefore, it would appreciate a response from you regarding action taken or contemplated with respect t o the recommendation in this letter. Please refer t o Safety Recommendation P-92-14 in your reply The Safety Board issued a similar recommendation, Safety Recommendation P-92-15, to the Department of the Air Force and Safety Recommendations P-92-6 through -13 to the Department of the Army., CQUGHLIN, Acting Chairman, and LAUBER, HART, HAMMERSCHMIDT, and KOLSTAD, Members, concurred i t ) .+his recommendation. By: Susan M. Coughiin \ Acting Chairman#