16 NYCRR 258.13
258.13 Report of specifications for proposed construction.
(a)The following maps, sketches, and drawings shall be filed with and as a part of the report of specifications:#
(1)three sets of current U.S. Geological Survey Maps (7½ or 15 minute) clearly indicating the entire route of the proposed construction or reconstruction and an area of one mile on either side of the route; and#
(2)three sets of strip maps and design drawings showing details of the proposed construction or reconstruction.#
(b)A report of specifications identical in format with subdivision (c) of this section shall be submitted in triplicate. Where additional space is necessary, supply the requested information on attached sheets.#
STATE OF NEW YORK#
DEPARTMENT OF PUBLIC SERVICE#
REPORT OF SPECIFICATIONS FOR PROPOSED CONSTRUCTION#
LIQUID PETROLEUM PIPELINE FACILITIES#
General Information#
General Information#
1. Corporation name Date ________#
2. Pipeline route:#
2. Pipeline route:#
From#
To#
3. Length#
4. New construction or reconstruction#
5. Counties traversed#
6. Towns traversed#
7. Cities traversed#
8. Villages traversed#
9. Estimated starting date#
10. Estimated completion date#
11. Pipeline identification name or number#
Pipe Specifications#
Pipe Specifications#
1. Nominal outside diameter, D (inches)#
2. Nominal wall thickness, t (inches)#
3. Type and/or grade of pipe#
4. Manufacturer of steel#
5. Manufacturer of pipe#
6. Longitudinal joint type#
7. Specified minimum yield strength, SMYS (psi)#
8. Nominal ultimate strength (psi)#
9. Fracture toughness (minimum Charpy Energy in ft. lbs. at 20°F for buried pipe, −20°F for exposed pipe)#
10. Mill test pressure (psi)#
11. Is pipe new or used#
12. If used pipe is employed, describe inspection and reconditioning procedures#
13. Are the physical and chemical specifications of pipe to be verified by outside laboratories? If yes, by whom?#
Operating Pressure and Stress#
Operating Pressure and Stress#
1. Maximum operating pressure, P (psi)#
2. Calculated pipe stress (hoop stress) = PD/2t (psi)#
3. Ratio of pipe stress to SMYS (percent)#
Welding#
Welding#
1. Percentage of welds to be radiographed, by location#
2. How will the corporation certify the radiographic technician#
Railroad, Road, and Water Crossings#
Railroad, Road, and Water Crossings#
1. Railroad and road crossings:#
1. Railroad and road crossings:#
Attach a list giving the location of each and indicating whether each is cased or uncased (if uncased, provide reason), and if heavier wall carrier pipe is used.#
Attach a list giving the location of each and indicating whether each is cased or uncased (if uncased, provide reason), and if heavier wall carrier pipe is used.#
2. Lake, river, stream, or creek crossings:#
2. Lake, river, stream, or creek crossings:#
Attach a list giving the location of each and describing any special construction precautions to be followed.#
Attach a list giving the location of each and describing any special construction precautions to be followed.#
3. Pipeline encroachments:#
3. Pipeline encroachments:#
Attach a list of any encroachments to railroads or roads, by location, and describe any special construction precautions to be followed.#
Attach a list of any encroachments to railroads or roads, by location, and describe any special construction precautions to be followed.#
Valves (see 49 CFR 195.260)#
Valves (see 49 CFR 195.260)#
1. Number and spacing of manual sectionalizing valves#
2. Type, make, and location of any automatic valves to be used#
Minimum Cover and Clearance (see 49 CFR 195.248, 250)#
Minimum Cover and Clearance (see 49 CFR 195.248, 250)#
If the minimum prescribed cover and/or clearance cannot be maintained, indicate the location, nature of problem, cover and/or clearance to be maintained, and any special precautions to be observed. Corrosion Control (see 49 CFR 195 Subpart H - Corrosion Control)#
If the minimum prescribed cover and/or clearance cannot be maintained, indicate the location, nature of problem, cover and/or clearance to be maintained, and any special precautions to be observed. Corrosion Control (see 49 CFR 195 Subpart H - Corrosion Control)#
1. Type of field coating:#
1. Type of field coating:#
For pipe (if not factory coated)#
For welds and fittings#
2. Type of coating test:#
2. Type of coating test:#
Before backfill#
After backfill#
3. Type of cathodic protection system#
Pressure and Leakage Tests (see section 258.6 of this Part)#
Pressure and Leakage Tests (see section 258.6 of this Part)#
1. Test pressure#
2. Test medium#
3. Test duration#
4. Length of test section(s)#
Right-of-Way#
Right-of-Way#
1. Has necessary right-of-way been obtained from each party having interest in the right-of-way? If not, what is the status?#
1. Has necessary right-of-way been obtained from each party having interest in the right-of-way? If not, what is the status?#
2. Have formal approval and all necessary permits been obtained from governmental agencies? If not, what is the status?#
2. Have formal approval and all necessary permits been obtained from governmental agencies? If not, what is the status?#
Products Transported#
Products Transported#
Pipeline certified to transport the following liquid petroleum products:#
Pipeline certified to transport the following liquid petroleum products:#
1.#
2.#
3.#
4.#
5.#
Signature of corporation officer#
Signature of corporation officer#
Title#
Title#