CPF 120121018M
CPF 120121018M
case documentOfficial PDF120121018M_NOA_07132012_text.pdf#
party submissionOfficial PDF120121018M_Operator Response_08082012.pdf#
120121018M_Closure Letter_08202012_text.pdf, page 1Official PDFU.S. Department Of Transportation Pipeline and 609.989.2171 Hazardous Materials Safety Administration 820 Bear Tavern Road, Suite 103 West Trenton, NJ 08628 EXPRESS OVERNIGHT DELIVERY August 20, 2012 Martin A. Fritz, President of Operations EQT Midstream 625 Liberty Avenue, Suite 1700 Pittsburgh, PA 15222 CPF 1-2012-1018M Dear Mr. Fritz: During the week of November 28, 2011, representatives from the Pipeline and Hazardous Materials Safety Administration (PHMSA), pursuant to chapter 601 of 49 United States Code, conducted an on-site pipeline safety inspection of EQT Midstream’s procedures in Washington, PA. As a result of the inspection, EQT Midstream was issued a Notice of Amendment on July 13, 2012, which proposed amendment of your procedures. EQT Midstream submitted its amended procedures on August 8, 2012. My staff reviewed the amended procedures, and it appears that the inadequacies outlined in this Notice of Amendment have been corrected. This letter is to inform you no further action is necessary and this case is now closed. Thank you for your cooperation. Sincerely, Byron Coy, PE Director, Eastern Region Pipeline and Hazardous Materials Safety Administration#
This material provides agency context. It does not replace binding regulatory text, and its legal effect depends on the underlying authority and facts.