CPF 120123003M
CPF 120123003M
case documentOfficial PDF120123003M_NOA_06112012.pdf#
case documentOfficial PDF120123003M_NOA_06112012_text.pdf#
party submissionOfficial PDF120123003M_Operator Response_07102012.pdf#
120123003M_Closure_Letter_04222013_text.pdf, page 1Official PDFU.S. Department of Transportation Pipeline and 609.989.2171 Hazardous Materials Safety Administration 820 Bear Tavern Road, Suite 103 West Trenton, NJ 08628 OVERNIGHT EXPRESS DELIVERY April 22, 2013 Mr. Joseph Neave VP, Safety and Regulatory Compliance Transcontinental Gas Pipe line Company 2800 Post Oak Blvd. Houston, TX 77056 CPF 1-2012-3003M Dear Mr. Neave: During the week of December 6, 2010, a representative from the Pipeline and Hazardous Materials Safety Administration (PHMSA), pursuant to chapter 601 of 49 United States Code, conducted an on-site pipeline safety inspection of Transcontinental Gas Pipe line Company’s, (Transco) procedures at the Carlstadt LNG Plant. As a result of the inspection, Transco was issued a Notice of Amendment on June 11, 2012, which proposed amendment of your procedures. Transcontinental Gas Pipe line Company submitted its amended procedures on July 11, 2012. My staff reviewed the amended procedures, and it appears that the inadequacies outlined in this Notice of Amendment have been corrected. This letter is to inform you no further action is necessary and this case is now closed. Thank you for your cooperation. Sincerely, Byron Coy, PE Director, Eastern Region Pipeline and Hazardous Materials Safety Administration#
120123003M_Closure Letter_04222013.pdf, page 1Official PDF@ U.S. Department of Transportation Pipeline and Hazardous Materials Safety Administration 82o BearTavem Road, Suite ro3 West Trenton, NJ 08628 609.989.zajL OVERNIGHT EXPRESS DELIVERY 4pil22,2013 Mr. Joseph Neave VP, Safety and Regulatory Compliance Transcontinental Gas Pipe line Company 2800 Post Oak Blvd. Houston, TX 77056 cPF r-20r2-3003M Dear Mr. Neave: Plring.the week of December 9._ ?o-r_O,.a representative from the pipeline and Hazardous Materials.safety Administration (PHMSA), p*iufl! to chapter 601 of 4^9 uniteJ states coae, :3111"^,:$:,1^1T:il. tip^"Jt_qrSftty_ inspecrion of rranscoritinenral cas eipe line Company's, ( r ransco) procedures at the Carlstadt LNG Plant. As a result of the insp6ction. Transco was issued a Notice of Amendment on June fi,20rt, *hi"h p;d;;-'"i"i,ia-."i^"r y"* procedures. Transcontinental Gas Pipe line company submitted its amended procedures on July I r, z0l2. My staff reviewed the amended procedures, and it appears that the inadequacies outiined in this Notice of Amendment have been conected. lT:.Pj:.^r:-i"_llf^1r- Vou no turther action is necessary and this case is now closed. Thank you Ior your cooperatlon. Sincerely, nqt( trh4-wl r ilv B)ion Coy, PE Director, Eastem Region Pipeline and Hazardous Materials Safety Administration#
This material provides agency context. It does not replace binding regulatory text, and its legal effect depends on the underlying authority and facts.