CPF 120125005M
CPF 120125005M
case documentOfficial PDF120125005M_NOA_02102012_text.pdf#
party submissionOfficial PDF120125005M_Operator_Response_and_Request_for_Hearing_03062012.pdf#
120125005M_Closure Letter_05312012_text.pdf, page 1Official PDFU.S. Department 820 Bear Tavern Road, Suite 103 Of Transportation West Trenton, NJ 08628 Pipeline and 609.989.2171 Hazardous Materials Safety Administration OVERNIGHT EXPRESS MAIL May 31, 2012 Larry D. Wilson, President Portland Pipeline Corporation 30 Hill Street South Portland, ME 04106 CPF 1-2012-5005M Dear Mr. Wilson: From October 4 to 6, 2011, a representative of the Pipeline and Hazardous Materials Safety Administration (PHMSA) pursuant to Chapter 601 of 49 United States Code inspected the Portland Pipeline Corporation’s (Portland) Public Awareness Program in South Portland, Maine. As a result of the inspection, Portland was issued a Notice of Amendment (NOA) on February 10, 2012. On March 6, 2012, Portland submitted its initial response to the NOA, along with proposed amendments. On May, 22, 2012, Portland completed its submission of amended procedures. My staff reviewed the amended procedures, and it appears that the inadequacies set forth in the NOA have been corrected. This letter is to inform you no further action is necessary and this case is now closed. Thank you for your cooperation. Sincerely, Byron Coy, PE Director, Eastern Region Pipeline and Hazardous Materials Safety Administration#
This material provides agency context. It does not replace binding regulatory text, and its legal effect depends on the underlying authority and facts.