CPF 120125011M
CPF 120125011M
case documentOfficial PDF120125011M_NOA_06112012.pdf#
case documentOfficial PDF120125011M_NOA_06112012_text.pdf#
party submissionOfficial PDF120125011M_Operator Response_07112012.pdf#
120125011M_Closure Letter_0822012_text.pdf, page 1Official PDFU.S. Department Of Transportation Pipeline and 609.989.2171 Hazardous Materials Safety Administration 820 Bear Tavern Road, Suite 103 West Trenton, NJ 08628 EXPRESS OVERNIGHT DELIVERY August 22, 2012 Jimmie E. James, VP & Northern Ops Mgr. ExxonMobil Pipeline Co. 3225 Gallows Rd. Fairfax, VA 22037 CPF 1-2012-5011M Dear Jimmie James: During the week of November 14, 2011, a representative from the Pipeline and Hazardous Materials Safety Administration (PHMSA), pursuant to chapter 601 of 49 United States Code, conducted an on-site pipeline safety inspection of ExxonMobil’s procedures in East Providence, RI. As a result of the inspection, ExxonMobil was issued a Notice of Amendment on June 11, 2012, which proposed amendment of your procedures. ExxonMobil submitted its amended procedures on July 11, 2012. My staff reviewed the amended procedures, and it appears that the inadequacies outlined in this Notice of Amendment have been corrected. This letter is to inform you no further action is necessary and this case is now closed. Thank you for your cooperation. Sincerely, Byron Coy, PE Director, Eastern Region Pipeline and Hazardous Materials Safety Administration#
120125011M_Closure Letter_08222012.pdf, page 1Official PDF@ U,S, DepOftmgnt 820 Bear Tavern Road, suite to3 Of TfOnSpOftOtion west rrenton, NJ 08628 Plpeline and 009.989.2t 7l Hazardous Materials Safery Administration EXPRESS OVERIYIGHT DELIVERY Atgrst22,2012 Jimmie E. James, VP & Northem Ops Mgr. ExxonMobil Pipeline Co. 3225 Gallows Rd. Fairfax,YA 22037 cPF 1-2012-5011M Dear Jimmie James: During the week of November 14, 2011, a representative from the Pipeline and Hazardous Materials Safety Administration (PHMSA), pursuant to chapter 601 of 49 United States Code, conducted an on-site pipeline safety inspection of ExxonMobil's procedures in East Providence, RI. As a result of the inspection, ExxonMobil was issued a Notice of Amendment on June 11, 2012, which proposed amendment of your procedures. ExxonMobil submitted its amended procedures on July 11,2012. My staff reviewed the amended procedures, and it appears that the inadequacies outlined in this Notice of Amendment have been corrected. This letter is to inform you no fi.rther action is necessary and this case is now closed. Thank you for your cooperation. Sincerely, Ac/1, I2V.-/--t'"tY 1 1 'uvv Byron Coy, PE Director, Eastern Region Pipeline and Hazardous Materials Safety Administration#
This material provides agency context. It does not replace binding regulatory text, and its legal effect depends on the underlying authority and facts.