CPF 120131010M
CPF 120131010M
case documentOfficial PDF120131010M_NOA_07122013.pdf#
case documentOfficial PDF120131010M_NOA_07122013_text.pdf#
party submissionOfficial PDF120131010M_Operator Response to Notice_08122013.pdf#
120131010M_Closure Letter_04042014_text.pdf, page 1Official PDFU.S. Department Of Transportation Pipeline and 609.989.2171 Hazardous Materials Safety Administration 820 Bear Tavern Road, Suite 103 West Trenton, NJ 08628 OVERNIGHT EXPRESS DELIVERY April 04, 2014 Jeffrey Bruner President Iroquois Gas Corporation One Corporate Drive, Suite 600 Shelton, CT 06484 CPF 1-2013-1010M Dear Mr. Bruner: From October 11 to October 13, 2011, representatives of the Pipeline and Hazardous Materials Safety Administration, Office of Pipeline Safety, pursuant to Chapter 601 of 49 United States Code, conducted an on-site pipeline safety inspection of Iroquois Gas Corporation’s (Iroquois) procedures for Control Room Management in Shelton, Connecticut. As a result of the inspection, Iroquois was issued a Notice of Amendment (Notice) on July 12, 2013, which proposed amendment of your procedures. Iroquois submitted its amended procedures on August 12, 2013 and January 8, 2014. My staff reviewed the amended procedures, and it appears that the inadequacies outlined in this Notice have been corrected. This letter is to inform you no further action is necessary and this case is now closed. Thank you for your cooperation. Sincerely, Byron Coy, PE Director, Eastern Region Pipeline and Hazardous Materials Safety Administration#
This material provides agency context. It does not replace binding regulatory text, and its legal effect depends on the underlying authority and facts.