CPF 120135022M
CPF 120135022M
case documentOfficial PDF120135022M_NOA_10012013.pdf#
case documentOfficial PDF120135022M_NOA_10012013_text.pdf#
party submissionOfficial PDF120135022M_Operator Response_10292013.pdf#
120135022M_Closure Letter_11072013.pdf, page 1Official PDF@ U.S. Department Of Transportation Pipeline and Hazardous Materials SafetyAdministration 8zo Bear Tavern Road, Suite ro3 West Trenton, NJ o8628 6o9.989.zr7r OVERNIGHT EXPRESS DELIVERY November 7,2013 Mr. Larry Wilson, President Portland Pipe Line Corporation 30 Hill Street South Portland. ME 04106 cPF 1-2013-5022M Dear Mr. Wilson: On September 24, 2012, a representative of the Pipeline and Hazardous Materials Safety Administration (PHMSA) pursuant to Chapter 601 of 49 United States Code inspected Portland Pipe Line Corporation (PMPL) Operations and Maintenance procedures in South Portland, Maine. As a result of the inspection, PMPL was issued a Notice of Amendment on October l, 2013, which proposed amendment of your procedures. PMPL submitted its amended procedures on October 29,2013. My staff reviewed the amended procedures, and it appears that the inadequacies outlined in this Notice of Amendment have been corrected. This letter is to inform you no funher action is necessary and this case is now closed. Thank you for your cooperation. Sincerely, Byron Coy, PE Director, Eastern Region Pipeline and Hazardous Materials Safety Administration#
120135022M_Closure_Letter_11072013_text.pdf, page 1Official PDFU.S. Department Of Transportation Pipeline and 609.989.2171 Hazardous Materials Safety Administration 820 Bear Tavern Road, Suite 103 West Trenton, NJ 08628 OVERNIGHT EXPRESS DELIVERY November 7, 2013 Mr. Larry Wilson, President Portland Pipe Line Corporation 30 Hill Street South Portland, ME 04106 CPF 1-2013-5022M Dear Mr. Wilson: On September 24, 2012, a representative of the Pipeline and Hazardous Materials Safety Administration (PHMSA) pursuant to Chapter 601 of 49 United States Code inspected Portland Pipe Line Corporation (PMPL) Operations and Maintenance procedures in South Portland, Maine. As a result of the inspection, PMPL was issued a Notice of Amendment on October 1, 2013, which proposed amendment of your procedures. PMPL submitted its amended procedures on October 29, 2013. My staff reviewed the amended procedures, and it appears that the inadequacies outlined in this Notice of Amendment have been corrected. This letter is to inform you no further action is necessary and this case is now closed. Thank you for your cooperation. Sincerely, Byron Coy, PE Director, Eastern Region Pipeline and Hazardous Materials Safety Administration#
This material provides agency context. It does not replace binding regulatory text, and its legal effect depends on the underlying authority and facts.