CPF 120145001M
CPF 120145001M
case documentOfficial PDF120145001M_NOA_04022014.pdf#
case documentOfficial PDF120145001M_NOA_04022014_text.pdf#
party submissionOfficial PDF120145001M_Operator Response Notice_04292014.pdf#
120145001M_Closure Letter_11072014_text.pdf, page 1Official PDFU.S. Department of Transportation Pipeline and 609.989.2171 Hazardous Materials Safety Administration 820 Bear Tavern Road, Suite 103 West Trenton, NJ 08628 EXPRESS OVERNIGHT DELIVERY November 07, 2014 T. Scott Collier Vice President, Performance Assurance Asset Integrity Buckeye Partners, L.P. Five Tek Park 9999 Hamilton Boulevard Breinigsville, PA 18031 CPF 1-2014-5001M Dear Mr. Collier: From March 12 to 16, 2012, representatives of the Pipeline and Hazardous Materials Safety Administration (PHMSA), Office of Pipeline Safety (OPS), pursuant to Chapter 601 of 49 United States Code inspected Buckeye Partners, L.P.’s (Buckeye) control room management procedures titled Control Room Management Plan, February 24, 2012 in Breinigsville, Pennsylvania. As a result of this inspection, Buckeye was issued a Notice of Amendment (NOA) on April 2, 2014 which proposed amendment to its procedures. Buckeye submitted its amended procedures on August 28, 2014. My staff reviewed the amended procedures, and it appears that the inadequacies outlined in this NOA have been corrected. This letter is to inform you no further action is necessary and this case is now closed. Thank you for your cooperation. Sincerely, Byron Coy, PE Director, Eastern Region Pipeline and Hazardous Materials Safety Administration#
This material provides agency context. It does not replace binding regulatory text, and its legal effect depends on the underlying authority and facts.