CPF 120151010M
CPF 120151010M
case documentOfficial PDF120151010M_NOA_05012015.pdf#
case documentOfficial PDF120151010M_NOA_05012015_text.pdf#
party submissionOfficial PDF120151010M_Operator Response to Notice and Request for Hearing and Time Extension_05292015.pdf#
120151010M_Closure Letter_10132016_text.pdf, page 1Official PDFOVERNIGHT EXPRESS DELIVERY October 13, 2016 David Bauer President, National Fuel Gas Supply Corp. 6363 Main Street Williamsville, NY 14221 CPF 1-2015-1010M Dear Mr. Bauer: During the weeks of April 14, 2014 and April 28, 2014, a representative from the Pipeline and Hazardous Materials Safety Administration (PHMSA), pursuant to Chapter 601 of 49 United States Code, conducted an on-site pipeline safety inspection of National Fuel Gas Supply Corp’s (hereafter referred to as “NFG”) procedures in Cecil, PA. As a result of the inspection, NFG was issued a Notice of Amendment on May 1, 2015, which proposed amendment of its procedures. NFG submitted its amended procedures on February 15, 2016. My staff reviewed the amended procedures, and it appears that the inadequacies outlined in this Notice of Amendment have been corrected. This letter is to inform you no further action is necessary and this case is now closed. Thank you for your cooperation. Sincerely, Byron Coy, PE Director, Eastern Region Pipeline and Hazardous Materials Safety Administration#
This material provides agency context. It does not replace binding regulatory text, and its legal effect depends on the underlying authority and facts.