CPF 120151022M
CPF 120151022M
case documentOfficial PDF120151022M_NOA_09092015.pdf#
case documentOfficial PDF120151022M_NOA_09092015_text.pdf#
party submissionOfficial PDF120151022M_Operator Response To Notice_10082015.pdf#
120151022M_Closure Letter_11192015_text.pdf, page 1Official PDFOVERNIGHT EXPRESS DELIVERY November 19, 2015 Mr. Steven Thompson Senior Vice President Eastern Shore Natural Gas Company 909 Silver Lake Boulevard Dover, DE 19901 CPF 1-2015-1022M Dear Mr. Thompson: From November 17 through November 21, 2014, representatives of the Pipeline and Hazardous Materials Safety Administration (PHMSA), Office of Pipeline Safety (OPS), pursuant to Chapter 601 of 49 United States Code inspected the Eastern Shore Natural Gas Company (ESNG) Control Room Management (CRM) procedures in Dover, Delaware. As a result of the inspection, ESNG was issued a Notice of Amendment on September 9, 2015, which proposed amendment of your procedures. ESNG submitted its amended procedures on October 8, 2015. My staff reviewed the amended procedures, and it appears that the inadequacies outlined in this Notice of Amendment have been corrected. This letter is to inform you no further action is necessary and this case is now closed. Thank you for your cooperation in this matter. Sincerely, Byron Coy, PE Director, Eastern Region Pipeline and Hazardous Materials Safety Administration#
This material provides agency context. It does not replace binding regulatory text, and its legal effect depends on the underlying authority and facts.