CPF 120155003M
CPF 120155003M
case documentOfficial PDF120155003M_NOA_02252015.pdf#
case documentOfficial PDF120155003M_NOA_02252015_text.pdf#
120155003M_Closure Letter_04212015_text.pdf, page 1Official PDFU.S. Department Of Transportation Pipeline and 609.989.2171 Hazardous Materials Safety Administration 820 Bear Tavern Road, Suite 103 West Trenton, NJ 08628 OVERNIGHT EXPRESS DELIVERY April 21, 2015 Mr. Tim Felt President and Chief Executive Officer Colonial Pipeline Company 1185 Sanctuary Parkway, Suite 100 Alpharetta, GA 30009 CPF 1-2015-5003M Dear Mr. Felt: From October 27 through 31, 2014, a representative from the Pipeline and Hazardous Materials Safety Administration, Office of Pipeline Safety, pursuant to Chapter 601 of 49 United States Code conducted an on-site pipeline safety inspection of Colonial Pipeline Company’s (CPC) procedures in Linden, New Jersey. As a result of the inspection, CPC was issued a Notice of Amendment on February 25, 2015, which proposed amendment of its procedures. CPC submitted its amended procedures on March 26, 2015. My staff reviewed the amended procedures, and it appears that the inadequacies outlined in this Notice of Amendment have been corrected. This letter is to inform you no further action is necessary and this case is now closed. Thank you for your cooperation. Sincerely, Byron Coy, PE Director, Eastern Region Pipeline and Hazardous Materials Safety Administration#
This material provides agency context. It does not replace binding regulatory text, and its legal effect depends on the underlying authority and facts.