CPF 120193005
CPF 120193005
case documentOfficial PDF120193005_NOPV PCO_12052019.pdf#
case documentOfficial PDF120193005_NOPV PCO_12052019_text.pdf#
party submissionOfficial PDF120193005_Operator Response to Notice_01022020.pdf#
120193005_Closure Letter (REVISED)_07282020_text.pdf, page 1Official PDFOVERNIGHT EXPRESS DELIVERY July 28, 2020 Joseph Hartz Vice President, Asset Management UGI Energy Services, LLC 835 Knitting Mills Way Wyomissing, PA 19610 CPF 1-2019-3005 Dear Mr. Hartz: Please disregard the July 23, 2020 Closure Letter which referenced an incorrect Final Order date for CPF 1-2019-3005. The information below has been updated to reflect the correct date. On February 24, 2020, the Pipeline and Hazardous Materials Safety Administration (PHMSA) issued to UGI Energy Services, LLC, a Final Order in the above-referenced case. This Order included a Compliance Order. Based on our review of the documentation you provided, it has been determined that you have complied with the terms of this Order. Accordingly, this case is now closed and no further action is contemplated with respect to the matters involved in this case. Thank you for your cooperation in this matter. Sincerely, Robert Burrough Director, Eastern Region Pipeline and Hazardous Materials Safety Administration#
120193005_Final Order_02242020_text.pdf, page 1Official PDFFebruary 24, 2020 Mr. Joseph Hartz President UGI Energy Services, LLC 1 Meridian Boulevard Wyomissing, Pennsylvania 19610 Re: CPF No. 1-2019-3005 Dear Mr. Hartz: Enclosed please find the Final Order issued in the above-referenced case. It makes a finding of violation and specifies actions that need to be taken to comply with the pipeline safety regulations. When the terms of the compliance order are completed, as determined by the Director, Eastern Region, this enforcement action will be closed. Service of the Final Order by certified mail is effective upon the date of mailing, as provided under 49 C.F.R. § 190.5. Thank you for your cooperation in this matter. Sincerely, Alan K. Mayberry Associate Administrator for Pipeline Safety Enclosures (Final Order and NOPV) cc: Mr. Robert Burrough, Director, Eastern Region, Office of Pipeline Safety, PHMSA Mr. Dante D’Alessandro, Vice President – Engineering and Operations, UGI Energy Services, LLC CERTIFIED MAIL - RETURN RECEIPT REQUESTED#
120193005_Final Order_02242020_text.pdf, page 2U.S. DEPARTMENT OF TRANSPORTATION PIPELINE AND HAZARDOUS MATERIALS SAFETY ADMINISTRATION OFFICE OF PIPELINE SAFETY WASHINGTON, D.C. 20590 ____________________________________ In the Matter of ) UGI Energy Services, LLC, ) CPF No. 1-2019-3005 ) ) ) Respondent. ) ____________________________________) FINAL ORDER On December 5, 2019, pursuant to 49 C.F.R. § 190.207, the Director, Eastern Region, Office of Pipeline Safety (OPS), issued a Notice of Probable Violation (Notice) to UGI Energy Services, LLC (Respondent). The Notice proposed finding that Respondent had violated 49 C.F.R. § 193.2605(b)(1). The Notice also proposed certain measures to correct the violations. Respondent did not contest the allegation of violation nor the corrective measures. Based upon a review of all of the evidence, pursuant to § 190.213, I find Respondent violated the pipeline safety regulation listed below, as more fully described in the enclosed Notice, which is incorporated by reference: 49 C.F.R. § 193.2605(b)(1) (Item 1) ─ Respondent failed to include in its manuals of written procedures the details of the inspections or tests determined under § 193.2605(a). This finding of violation will be considered a prior offense in any subsequent enforcement action taken against Respondent. COMPLIANCE ACTIONS Pursuant to 49 U.S.C. § 60118(b) and 49 C.F.R. § 190.217, Respondent is ordered to take the actions proposed in the enclosed Notice to correct the violation. The Director may grant an extension of time to comply with any of the required items upon a written request timely submitted by the Respondent and demonstrating good cause for an extension. Upon completion of ordered actions, Respondent may request that the Director close the case. Failure to comply with this Order may result in the assessment of civil penalties under 49 C.F.R. § 190.223 or in referral to the Attorney General for appropriate relief in a district court of the United States.#
120193005_Final Order_02242020_text.pdf, page 3CPF No. 1-2019-3005 Page 2 The terms and conditions of this order are effective upon service in accordance with 49 C.F.R. § 190.5. February 24, 2020 ___________________________________ _________________________ Alan K. Mayberry Date Issued Associate Administrator for Pipeline Safety#
120193005_Closure Letter_07232020_text.pdf, page 1Official PDFOVERNIGHT EXPRESS DELIVERY July 23, 2020 Joseph Hartz Vice President, Asset Management UGI Energy Services, LLC 1 Meridian Boulevard Wyomissing, PA 19610 CPF 1-2019-3005 Dear Mr. Hartz: On December 5, 2019, the Pipeline and Hazardous Materials Safety Administration (PHMSA) issued to UGI Energy Services, LLC, a Final Order in the above-referenced case. This Order included a Compliance Order. Based on our review of the documentation you provided, it has been determined that you have complied with the terms of this Order. Accordingly, this case is now closed and no further action is contemplated with respect to the matters involved in this case. Thank you for your cooperation in this matter. Sincerely, Robert Burrough Director, Eastern Region Pipeline and Hazardous Materials Safety Administration#
This material provides agency context. It does not replace binding regulatory text, and its legal effect depends on the underlying authority and facts.