CPF 220045009
CPF 220045009
220045009_Final Order_10212004.pdf, page 1Official PDF(D U,S.Deportmenl ol Tronsporlotion Reieorch ond Speciol Progrcmi Adminisfrolion 400 Sevenlh Sl S W Washrngton. D.C ?0590 }cT 21 2cc.i Mr. Scott O. Nugent Vice President & General Manager Dixie Pipeline Company Suite West 301 1117 Perimeter Center Atlanta, Georgia 30338-5423 Re: CPF No. 2-2004-5009 Dear Mr. Nugent: Enclosed is the Final Order issued by the Associate Administrator for Pipeline Safety in the above-referenced case. It makes a frnding ofviolation and assesses a civil penalty of$25,000. The penaltypayrnent terms are set forth in the Final Order. This enforcement action closes automatically upon payrnent. Your receipt ofthe Final Order constitutes service ofthat document under 49 C.F.R. $ 190,5. Sincerely, \h" r-f*" I "- Y*.t Reynolds Pipeline Compliance RegistrY Office of Pipeline SafetY Enclosure#
220045009_Final Order_10212004.pdf, page 2DEPARTMENT OF TRANSPORTATION RESEARCH AND SPECIAL PROGRAMS ADMINISTRATION OFFICE OF PIPELINE SAFETY V/ASHINGTON, DC 20590 In the Matter of Dixie Pipeline Company, Respondent ) ) ) ) ) ) ) CPF No. 2-2004-5009 FINAL ORDER OtlttlyT-24,,2003, pursuant to 49 U.S.C. $ 60117, arepresentative ofthe Office of Pipeline Safety (OPS) conducted an on-site pipeline safety inspection of Respondent's facilities and records in Alabama, Georgia, Mississippi, North Carolina, and South Carolina. As a result of the inspection, the Director, Southern Region, OPS, issued to Respondent, by letter dated Apnl22,2004, a Notice ofProbable Violation and Proposed Civil Penalty (Notice). In accordance with 49 C.F.R. $ 190.207, the Notice proposed finding that Respondent had violated 49 C.F.R. $ 195.a06(a)(3) and proposed assessing a civil penalty of$25,000 for the alleged violation. RespondentrespondedtotheNoticebyletterdatedMay25,2004(Response). Respondentcontested the allegation of violation, offered information to explain the allegation, and requested that the proposed civil penalty be eliminated or reduced. Respondent did not request a hearing, and therefore has waived its right to one. FINDING OF VIOLATION The Notice alleged that Respondent violated 49 C.F.R. $ 1 95.a06(a)(3). This regulation states that an operator may not operate a pipeline at a pressure that exceeds the maximum operating pressure (MOP). The Notice alleged that Respondent operated its pipeline at a pressure that exceeded MOP on December 26, 2002 at its Norwood Station, where the discharge pressure exceeded the engineeringcalculatedMOPofl,456psifromapproximately2:40p.m.to4:10p.m' Duringthat time, pressure exceeded 1,460 psi and ranged up to 1 ,480 psi. In its Response, Respondent admitted that the pressure exceeded MOP as alleged in the Notice' However, Respondent contended that it committedno violationbecause the pressure never exceeded 1 l0 percent of MOP. Respondent also explained that it had protective equipment in place to ensure that pressure did not exceed 110 percent of MOP. In support of its contention that it committed no violation, Respondent cited $ 195.406(b), which states that Respondent may not permlt pressure to exceed I l0 percent of MOP during surges or other variations from normal operations'#
220045009_Final Order_10212004.pdf, page 3z Although $ 195.406(b) provides an allowance for excursions above MOP, the allowance only applies during a surge or other variation from normal operations. In its Response, Respondent did not contend that the pressure increase that occurred on Decemb er26,2002was a surge or other variation from normal operations. To the conhary, the record indicates that the increase occurred during normal operations. The pressure excursion lasted for approximately 1.5 hours. Although Respondent was aware that pressure had exceeded MOP, Respondent did not take immediate corrective action to bring the pressure down to MOP. Instead, Respondent allowed the pipeline to operate above MOP until the excess pressure gradually decreased to MOP. Accordingly, I find Respondent violated $ 195.406(a)(3) by operating its pipeline at a pressure that exceeded MOP. This finding of violation will be considered a prior offense in any subsequent enforcement action taken against Respondent. ASSESSMENT OF PENALTY Under 49 U.S.C. S 60122, Respondent is subject to a civil penalty not to exceed $100,000 per violation for each day of the violation up to a maximum of $1,000,000 for any related series of violations. The Notice proposed a civil penalty of $25,000 for violation of $ 195.a06(a)(3). 49 U.S.C. S 60122 and 49 C.F.R. $ 190.225 require that, in determining the amount of the civil penalty, I consider the following criteria: nature, circumstances, lnd gravity of the violation, degree of Respondent's culpability, history of Respondent's prior offenses, Respondent's ability to pay the penalty, good faith by Respondent in attempting to achieve compliance, the effect on Respondent's ability to continue in business, and such other matters as justice may require. Inits Response, Respondent requested that theproposed civil penaltybe reduced orwithdrawn based on Respondent's effort to comply with the pressure safety regulations. Respondent explained that prior to the event, control pressure had been set to less than MOP and operational shutdown had been set to prevent pressure from exceeding 110 percent ofthe control pressure. According to Respondent, operational shutdown was set at 1480 psi, so that pressure would be controlled within 103 percent of MOP. Respondent regarded this limit as "considerably less than the 110% allowed under 195.406(b).'" The efforts taken by Respondent were apparently directed at complying with $ 195.406(b), which requires that Respondent control pipeline pressure within 110 percent of MOP during surges and other variations from normal operations. Respondent's efforts to comply with $ 195'406(b) bV limiting pressure to within 103 percent of MOP do not justifu reducing the civil penalty proposed for violaiing $ 195.406(a)(3), which requires that Respondent operate at or below MOP during normal operations. MOP is calculated to ensure that product can be transported through a pipeline system without causing damaging stress to the integrity of the system. Operating at a pressure above MOP may increase the stress to a pipeline system and risk the release ofproduct due to pipeline failure'#
220045009_Final Order_10212004.pdf, page 4J Respondent has had problems with exceeding MOP in the past. During a 2001 inspection, OPS identified several occasions when pressure had exceeded MOP for several hours at a time. Respondent was notified of this concem, although no enforcement action was taken. Respondent took corrective action to address the matterbyrecalculating MOP, and notified OPS of the corrective action by letter dated June 16, 2001. In the present case, Respondent again allowed its system to operate above MOP for approximately 1.5 hours. The length of the pressure excursion was due in part by Respondent's failure to take prompt remedial action to reduce the pressure. Respondent also requested a reduction in the civil penalty based on the corrective action it has taken to ensure that a violation would not occur in the future. Respondent explained that it has upgraded its control equipment at the Norwood Station and added additional mechanisms to avoid future presswe increases. The upgrade was part of a system-wide program to improve control instrumentation at Respondent's plrmp stations. Respondent spent approximately $72,600 on improvements to its instrumentation and control equipment at the Norwood Station. These actions arecommendable. However,thesemeasuresdonotjustifyreducingthecivilpenalty,asRespondent is obligated by the pipeline safety regulations to take action necessary to ensure that its system complies with operating pressure requirements. Accordingly, having reviewed the record and considered the assessment criteria, I assess Respondent a total civil penalty of $25,000. A determination has been made that Respondent has the ability to pay this penalty without adversely affecting its ability to continue in business. Pa).rynent of the civil penalty must be made within 20 days of service. Federal regulations (49 C.F.R. $ 89.21(bX3)) require this payment be made by wire transfer, through the Federal Reserve Communications System (Fedwire), to the account of the U.S. Treasury. Detailed instructions are contained in the enclosure. Questions conceming wire transfers should be directed to: Financial Operations Division (ANIZ-120), Federal Aviation Administration, Mike Monroney Aeronautical Center, P.O. Box 25082, Oklahoma City, OK 73125; (405) 954-8893. Failure to pay the $25,000 civil penalty will result in accrual of interest at the current annual rate in accordancewith3l U.S.C. 53717,31C.F.R. $901.9and49C.F.R. $ 89.23. Pursuanttothosesame authorities, a late penalty charge of six percent (6%) per annum will be charged if payment is not made within 110 days of service. Furthermore, failure to pay the civil penalty may result in referral of the matter to the Attorney Gsneral for appropriate action in a United States District Court. Under 49 C.F.R. $ 190.215, Respondent has a right to submit a Petition for Reconsideration of this Final Order. The petition must be received within 20 days of Respondent's receipt of this Final Order and must contain a brief statement of the issue(s). The filing of the petition automatically#
220045009_Final Order_10212004.pdf, page 54 stays the payrnent of any civil penalty assessed. However if Respondent submits payment for the civil penalty, the Final Order becomes the final administrative action and the right to petition for reconsideration is waived. The terms and conditions of this Final Order are effective on receipt. OcT 2 1 iii, Date Issued Administrator#
This material provides agency context. It does not replace binding regulatory text, and its legal effect depends on the underlying authority and facts.