CPF 220051009
CPF 220051009
case documentOfficial PDFCPF NO 2-2005-1009 KENTUCKY-WEST VIRGINIA GAS.pdf#
220051009_Final Order_02162006.pdf, page 1Official PDF@ U.S. Deporfment of Tronsportolion Plpellne qnd Hqzqntous ltqferiols Sqlety Admlnlstrq0lon 400 Seventh Street. S.W. Washington, D.C- 20590 FEil I 6 1,,,:,i Mr. Jefferson C. Burke President & General Manager Kentucky-West Virginia Gas 748 North Lake Drive Prestonsburg, KY 41653 RE:CPF No. 2-2005-1009 Dear Mr. Burke: Enclosed is the Final Order issued by the Associate Administrator for Pipeline Safety in the above-referenced case. It makes a finding of violation and assesses a civil penalty of $23,400. I acknowledge leceipt of, and accept Kentucky-West's payment dated August 29, 2005 in the amount of $23,400 as payment in full of the civil penalty assessed in the Final Order. This case is now closed. Your receipt of the Final Order constitutes service of that document under 49 c.F.R. I 190.5. Sincerely, ilrr +*^ lL 1-_ James Reynolds Pipeline Compliance Registry Office of Pipeline SafetY Enclosure cc: Ms. Linda Daugherty, Director, OPS Southern Region CERTIFIED iliAiL - RETUtn* RECEIPT REOUESTED#
220051009_Final Order_02162006.pdf, page 2DEPARTMENT OF' TRANSPORTATION PIPELINE AND HAZARDOUS MATERIALS SAF'ETY ADMINISTRATION OFFICE OF PIPELINE SAF'ETY WASHINGTON. D.C. 20590 In the Matter of KENTUCKY-WEST PIPELINE An Equitable Resources Company Respondent. ) ) ) ) ) CPFNo. 2-2005-1009 FINAL ORDER Druing April 18-20,2005, pursuant to 49 U.S.C. $ 60117, representatives of the Office of Pipeline Safety (OPS), Southern Region, conducted an on-site pipeline safety inspection of Respondent's Kentucky-West pipeline system. As a result of the inspection, the Director, Southern Region, OPS, issued to Respondent, by letter dated August 1,2005, a Notice of Probable Violation and Proposed Civil Penalty Q.iotice). In accordance with 49 C.F.R. $ 190.207, the Notice proposed finding that Respondenthad committed aviolation of49 C.F.R. $ 192.603(b) and proposed assessing a civil penalty of$23,400 for the alleged violation. Respondent responded to the Notice by letter dated Augu st26,2005 (Response). Respondent did not contest the allegation of violation but offered an explanation. Respondent did not request a hearing, and therefore has waived its right to one, F'INDINGS OF' VIOLATION Uncontested Respondent did not contest the alleged violation of 49 C.F.R. S 192.603(b) in the Notice. Accordingly, I find that Respondent violated 49 C.F.R. ParI I92, as more fully described in the Notice: 49 C.F.R. $192.603(b) - failure to maintain records to demonstrate inspection and testing of relief devices for compressor stations and proper maintenance of its compressor stations emergency shut down devices (ESD), as required by S192.73 1(a-c). Therecordsweremissingseveralannual inspectionreports. The records revierved from the year 2002 through 2005 indicated that several compressor station ESDs did not work when activated and need replacement of defective equipment. This finding of violation will be considered a prior offense in any subsequent enforcement action taken against Respondent.#
220051009_Final Order_02162006.pdf, page 32 ASSESSMENT OF PENALTY Under 49 U.S.C. § 60122, Respondent is subject to a civil penalty not to exceed $100,000 per violations. violation for each day of the violation up to a maximum of $1,000,000 for any related series of 49 U.S.C. § 60122 and 49 C.F.R. § 190.225 require that, in determining the amount of the civil penalty, I consider the following criteria: nature, circumstances, and gravity of the violation, degree of Respondent's culpability, history of Respondent's prior offenses, Respondent's ability to pay the penalty, good faith by Respondent in attempting to achieve compliance, the effect on Respondent's ability to continue in business, and such other matters as justice may require. The Notice proposed a civil penalty of $23,400 for Item 1. Respondent did not contest the violation or the civil penalty. Accordingly, having reviewed the record and considered the assessment criteria, I assess Respondent a civil penalty of $23,400, already paid by the Respondent. he lom and contin of this in dear fictive on reciper. FEB 16 2003 Stacey Ciprard Associate Administrator Date Issued for Dipeline Safety#
This material provides agency context. It does not replace binding regulatory text, and its legal effect depends on the underlying authority and facts.