CPF 220091002H
CPF 220091002H
case documentOfficial PDF220091002H_CAO_05072009.pdf#
case documentOfficial PDF220091002H_CAO_05072009_text.pdf#
220091002H_closure Letter_09102012_text.pdf, page 1Official PDFCERTIFIED MAIL - RETURN RECEIPT REQUESTED September 10, 2012 Mr. Eric Amundsen VP Technical Services Panhandle Energy 5051 Westheimer Road Houston, Texas 77056 CPF 2-2009-1002H Dear Mr. Amundsen: On August 30, 2012, you wrote to the Pipeline and Hazardous Materials Safety Administration (PHMSA) Southern Region, Office of Pipeline Safety requesting closure of the Corrective Action Order (CAO) (CPF No. 2-2009-1002H) that PHMSA issued on May 7, 2009, in response to the May 4, 2009, incident on the Florida Gas Transmission (FGT) 100 Line in Martin County, Florida. The CAO specifically addressed FGT’s 18-inch pipeline segment that extends approximately 56.8 miles from Ft. Pierce (Station 20) to Cutler, Florida. This letter is to inform you that the Southern Region has reviewed all the actions taken by FGT with respect to the CAO and we find that FGT has complied with the terms of the CAO. No further actions are necessary with regards to the CAO. This case is now closed. Accordingly, all pressure restrictions established by the CAO are withdrawn. FGT can return this pipeline segment to its maximum allowable operating pressure (MAOP). Please be advised that this letter refers only to the CAO (CPF 2-2009-1002H) and not to any other PHMSA pending cases. Also be advised that nothing herein states or implies that the above described pipeline segment meet the requirements of the federal pipeline safety regulations. The pipeline system remains subject to inspection by PHMSA. Sincerely, Wayne T. Lemoi Director, Office of Pipeline Safety PHMSA Southern Region#
This material provides agency context. It does not replace binding regulatory text, and its legal effect depends on the underlying authority and facts.