CPF 220101006M
CPF 220101006M
case documentOfficial PDF220101006M_NOA_03112010.pdf#
case documentOfficial PDF220101006M_NOA_03112010_text.pdf#
party submissionOfficial PDF220101006M_operator response_04072010.pdf#
220101006M_closure letter_11262010_text.pdf, page 1Official PDFNovember 26, 2010 Mr. William Cope Vice President, Eastern Operations Tennessee Gas Pipeline 569 Brookwood Village Room 766 Birmingham, AL 35209 CPF 2-2010-1006M Dear Mr. Cope: On September 22, 2009, a representative of the Pipeline and Hazardous Materials Safety Administration (PHMSA), Office of Pipeline Safety inspected the Tennessee Gas Pipeline (TGP) Operator Qualification (OQ) program procedures in Clay City, Kentucky, pursuant to Chapter 601 of 49 United States Code. As a result of the inspection, PHMSA issued a Notice of Amendment (NOA) on March 11, 2010, which required TGP to amend its OQ program procedures. The PHMSA Southern Region has reviewed your November 17, 2010, written response to the NOA. We find that you have met the requirements specified in the NOA. No further action is necessary with regards to the NOA and this case is now closed. Please be advised that nothing herein states or implies that the above described OQ program meets the requirements of the federal pipeline safety regulations or that the program is approved. The pipeline system and its OQ program remain subject to inspection by PHMSA. Sincerely, Wayne T. Lemoi Director, Office of Pipeline Safety PHMSA Southern Region#
This material provides agency context. It does not replace binding regulatory text, and its legal effect depends on the underlying authority and facts.