party submissionOfficial PDF220125006M_Operator_Response_06212012.pdf#
220125006M_notice of amendment_06052012_text.pdf, page 1Official PDFNOTICE OF AMENDMENT CERTIFIED MAIL - RETURN RECEIPT REQUESTED June 5, 2012 Mr. Greg Smith President Shell Pipeline Company, L.P. Two Shell Plaza 777 Walker Street, Room 1437 Houston, TX 77002 CPF 2-2012-5006M Dear Mr. Smith: From April 9-11, 2012, a representative of the Pipeline and Hazardous Materials Safety Administration (PHMSA), Southern Region, Office of Pipeline Safety inspected the Shell Pipeline Company, L.P. (Shell) Capline Pipeline system’s written operations and maintenance procedures in Byhalia, MS, pursuant to Chapter 601 of 49 United States Code. On the basis of the inspection, PHMSA has identified apparent inadequacies within Shell’s written procedures, as described below: 1. §195.571 What criteria must I use to determine the adequacy of cathodic protection? Cathodic protection required by this Subpart must comply with one or more of the applicable criteria and other considerations for cathodic protection contained in paragraphs 6.2 and 6.3 of NACE SP 0169 (incorporated by reference, see § 195.3). Shell's written procedures in its Corrosion Control Inspection and Maintenance Manual (i.e. Procedure 571) did not adequately address how Shell complied with one or more of the applicable criteria and other considerations for cathodic protection contained in paragraphs 6.2 and 6.3 of NACE SP 0169, which is incorporated by reference in §195.3. Shell’s written Procedure 571 - Cathodic Protection Criteria listed three different cathodic protection criteria to include “1. - 0.850 volts versus Copper/Copper Sulfate half-cell with IR [voltage drop] considered.” The procedure further stated that “All are defined in NACE Standard Practice SP 0169. Detailed procedures for using these criteria are given in 27TG-001 External Corrosion Considerations from Pipeline Design and Construction."#
220125006M_notice of amendment_06052012_text.pdf, page 2However, neither Procedure 571 - Cathodic Protection Criteria or SPLC Standard 27TG-001 External Corrosion Considerations from Pipeline Design and Construction provided guidance or explanation on how Shell considered IR drop other than those across the structure-to-electrolyte boundary when using the - 0.850 volt criteria beyond the reference to NACE SP 0169. Response to this Notice This Notice is provided pursuant to 49 U.S.C. § 60108(a) and 49 C.F.R. § 190.237. Enclosed as part of this Notice is a document entitled Response Options for Pipeline Operators in Compliance Proceedings. Please refer to this document and note the response options. Be advised that all material you submit in response to this enforcement action is subject to being made publicly available. If you believe that any portion of your responsive material qualifies for confidential treatment under 5 U.S.C. 552(b), along with the complete original document you must provide a second copy of the document with the portions you believe qualify for confidential treatment redacted and an explanation of why you believe the redacted information qualifies for confidential treatment under 5 U.S.C. 552(b). If you do not respond within 30 days of receipt of this Notice, this constitutes a waiver of your right to contest the allegations in this Notice and authorizes the Associate Administrator for Pipeline Safety to find facts as alleged in this Notice without further notice to you and to issue a Final Order. If, after opportunity for a hearing, your plans or procedures are found inadequate as alleged in this Notice, you may be ordered to amend your plans or procedures to correct the inadequacies (49 C.F.R. § 190.237). If you are not contesting this Notice, we propose that you submit your amended procedures to my office within 30 days of receipt of this Notice. This period may be extended by written request for good cause. Once the inadequacies identified herein have been addressed in your amended procedures, this enforcement action will be closed. It is requested (not mandated) that Shell Pipeline Company, L.P. maintain documentation of the safety improvement costs associated with fulfilling this Notice of Amendment (preparation/revision of plans, procedures) and submit the total to Wayne T. Lemoi, Director, Southern Region, Pipeline and Hazardous Materials Safety Administration. In correspondence concerning this matter, please refer to CPF 2-2012-5006M and, for each document you submit, please provide a copy in electronic format whenever possible. Sincerely, Wayne T. Lemoi Director, Office of Pipeline Safety PHMSA Southern Region Enclosure: Response Options for Pipeline Operators in Compliance Proceedings 2#
220125006M_closure letter_07172012_text.pdf, page 1Official PDFCERTIFIED MAIL - RETURN RECEIPT REQUESTED July 17, 2012 Mr. Greg Smith President Shell Pipeline Company, L.P. Two Shell Plaza 777 Walker Street, Room 1437 Houston, TX 77002 CPF 2-2012-5006M Dear Mr. Smith: On June 5, 2012, the Pipeline and Hazardous Materials Safety Administration (PHMSA), Southern Region, Office of Pipeline Safety issued a Notice of Amendment (NOA) to Shell Pipeline Company, L.P. (Shell) as a result of a PHMSA inspection from April 9-12, 2012, of the Shell Capline Pipeline system’s written operations and maintenance procedures. The PHMSA Southern Region received and reviewed your response to the NOA dated June 21, 2012. This letter is to inform you that Shell has complied with the terms of the NOA and that no further action is necessary with regards to the NOA. This case is now closed. Please be advised that this letter refers only to the NOA (CPF 2-2012-5006M) and not to any other PHMSA pending cases. Also be advised that nothing herein states or implies that the above described written operations and maintenance procedures meet the requirements of the federal pipeline safety regulations or that they are approved. The Shell Capline Pipeline system remains subject to inspection by PHMSA. In future inspections, we will be looking closely at how Shell considered IR drop, other than those across the structure-to-electrolyte boundary when using the - 0.850 volt criteria, according to its amended “Consideration of IR Drop in Structure to Soil Potential Readings” procedures. Sincerely, Wayne T. Lemoi Director, Office of Pipeline Safety PHMSA Southern Region#
This material provides agency context. It does not replace binding regulatory text, and its legal effect depends on the underlying authority and facts.