CPF 320055042M
CPF 320055042M
320055042M_Closure_01302012_text.pdf, page 1Official PDFCERTIFIED MAIL - RETURN RECEIPT REQUESTED January 30, 2012 Timothy Barnhart Vice President of Operations Calumet Specialty Products Partners, LP 2780 Waterfront Parkway East Drive, Suite 200 Indianapolis, IN 46214 CPF 3-2005-5042M Dear Mr. Barnhart: On July 12-14, 2004, representatives from the Pipeline and Hazardous Materials Safety Administration (PHMSA), pursuant to chapter 601 of 49 United States Code, conducted an on- site pipeline safety inspection of Murphy Oil’s Integrity Management Program (IMP) in Superior, Wisconsin. As a result of the inspection, Murphy Oil was issued a Notice of Amendment on October 31, 2005 (CPF 3-2005-5042M), which proposed amendment of the IMP procedures. Subsequent to issuance of CPF 3-2005-5042, PHMSA Central Region conducted another inspection of Murphy Oil’s IMP on April 4 to 5, 2011. The Murphy Oil pipeline assets in Superior, Wisconsin have been purchased by Calumet Specialty Products Partners, LP who is now responsible for compliance. This letter is to inform you that no further action is necessary on CPF 3-2005-5042M issued as a result of the 2004 inspection, and this case is now closed. Thank you for your cooperation. Sincerely, David Barrett Director, Central Region Pipeline and Hazardous Materials Safety Administration#
This material provides agency context. It does not replace binding regulatory text, and its legal effect depends on the underlying authority and facts.