CPF 320075006W
CPF 320075006W
party submissionOfficial PDF320075006W_Operator Response to warning letter_04122007.pdf#
320075006W_Warning Letter_03062007.pdf, page 1Official PDFMAR O 7 2T|I @ U.S. Deponmenl of Tronsporlotion Plpellne ond Hozordous lloferlols sqtety Admlnlrtrollon 901 Locust Steet, Suite 462 Kansas City, MO 6410S2641 WARNINGLETTER CERTIX'IED MAIL - RETURN RECEIPT REOUESTED March 6.2007 Mr. Ron McClain Vice President Operations Kinder Morgan Energy Partners, L.P. 500 Dallas Street, Suite 1000 Houston, TX77002 cPF 3-2007-5006W DearMr. McClain: On April 4-8, April I l-15, April 25-29, and May 9-13, 2005, a representative of the Pipeline and Hazardous Materials Safety Administration (PHMSA) pursuant to Chapter 601 of 49 United States Code inspected your pipeline facilities in Illinois, Iowa, Kansas, Missouri, Indiana, and Nebraska. As a result of the inspection, it appears that you have committed probable violations of the Pipeline Safety Regulations, Title 49, Code of Federal Regulations. The items inspected and the probable violations are: 1. S195.404 Maps and Records. (b) Each operator shall maintain for at least 3 years daily operating records that indicate- (f) The discharge pressure at each pump station; Kinder Morgan did not have discharge pr€ssure records for Eldridge Pump Station for the complete 24 hour period on October 31,2003. Also, there were no discharge pressure records for Walnut Pump Station on October 27,2003.#
320075006W_Warning Letter_03062007.pdf, page 22. $195.420 Valve maintenance. (b) Each operator shall, at intervals not exceeding 7 1/2 months, but at least twice each calendar year, inspect each mainline valve to deterrnine that it is functioning properly. On the KSM 103 Line within Bushton Pump Station, the KSM l0l/103 bypass valve, SIN M335790-9, was installed in July 2004. This valve is operated weekly dwing normal operations, but the valve did not receive Ihe2"" 2004 mainline valve inspection, and was not inspected in 2005. Under49UnitedStatesCode, S60l22,youaresubjecttoacivilpenaltynottoexceed$100,000 for each violation for each day the violations persists up to a maximum of $1,000,000 for any related series of violations. We have reviewed the circumstances and supporting documents involved in this case, and have decided not to conduct additional enforcement action or penalty assessment proceedings at this time. We advise you to correct the items identified in this letter. Failure to do so will result in Kinder Morgan Energy Partners, L.P. being subject to additional enforcement action. No reply to this letter is required. If you choose to reply, in your correspondence please refer to CPF 3-2007-5006W. Be advised that all material you submit in response to this enforcement action is subject to being made publicly available. Ifyou believe that any portion ofyour responsive material qualifies for confidential treatment under 5 U.S.C. 552(b), along with the complete original document you must provide a second copy of the document with the portions you believe qualifu for confidential treatment redacted and an explanation of why you believe the redacted information qualifies for confidential treatment under 5 U.S.C. 552@). Director, Central Region Pipeline and Hazardous Materials Safety Administration#
This material provides agency context. It does not replace binding regulatory text, and its legal effect depends on the underlying authority and facts.