CPF 320085010H
CPF 320085010H
case documentOfficial PDF320085010H_CAO_08182008.pdf#
case documentOfficial PDF320085010h_cao_08182008_text.pdf#
320085010H_Closure Ltr_10202011_text.pdf, page 1Official PDFCERTIFIED MAIL - RETURN RECEIPT REQUESTED October 20, 2011 Mr. Shawn Lyon Vice President of Operations Marathon Pipe Line, LLC 539 South Main St. Findlay, Ohio 45840 CPF 3-2008-5010-H Dear Mr. Lyon: On August 18, 2008, the Pipeline and Hazardous Materials Safety Administration (PHMSA) issued to Marathon Pipe Line, LLC a Corrective Action Order in the above-referenced case. This Order included requirements to take corrective actions on your pipeline. Based on our review of the documentation you provided, it has been determined that you have complied with the terms of this Order. Accordingly, this case is now closed and no further action is contemplated with respect to the matters involved in this case. Thank you for your cooperation in this matter. Sincerely, David Barrett Director, Central Region Pipeline and Hazardous Materials Safety Administration#
This material provides agency context. It does not replace binding regulatory text, and its legal effect depends on the underlying authority and facts.