CPF 320105001H
CPF 320105001H
case documentOfficial PDF320105001H_CAO_01192010.pdf#
case documentOfficial PDF320105001H_CAO_01192010_text.pdf#
320105001H_Closure Letter_03012016_text.pdf, page 1Official PDFCERTIFIED MAIL - RETURN RECEIPT REQUESTED March 1, 2016 Mr. Bradley F. Shamla Vice President, US Operations Enbridge Energy, LP 7701 France Avenue South, Suite 600 Edina, Minnesota 55435 CPF 3-2010-5001H Dear Mr. Shamla: On January 19, 2010, the Pipeline and Hazardous Materials Safety Administration (PHMSA) issued to Enbridge Energy Partners, L.P. (“Enbridge”) a Corrective Action Order in the above-referenced case. This Order included a requirement to take corrective actions on your pipeline. Based on our review of the documentation you provided, it has been determined that you have complied with the terms of this Order. Accordingly, this case is now closed and no further action is contemplated with respect to the matters involved in this case. Thank you for your cooperation in this matter. Sincerely, Allan C. Beshore Director, Central Region, OPS Pipeline and Hazardous Materials Safety Administration cc: Mr. Andrew J. Harrington, Enbridge, Inc. Calgary, Alberta Canada Mr. Jeffrey D. Wiese, Associate Administrator of Pipeline Safety Washington, D.C.#
This material provides agency context. It does not replace binding regulatory text, and its legal effect depends on the underlying authority and facts.