CPF 320105010H
CPF 320105010H
case documentOfficial PDF320105010H_CAO_08262010.pdf#
case documentOfficial PDF320105010H_CAO_08262010_text.pdf#
320105010H_Closure_09032014_text.pdf, page 1Official PDFCERTIFIED MAIL - RETURN RECEIPT REQUESTED September 3, 2014 Mr. Steve Pankhurst President BP Pipelines (North America), Inc. 21800 Torch Parkway Warrenville, Illinois 60555 CPF 3-2010-5010H Dear Mr. Pankhurst: On August 26, 2010, the Pipeline and Hazardous Materials Safety Administration (PHMSA) issued to BP Pipelines (North America), Inc. a Corrective Action Order in the above-referenced case. This Order included a requirement to take corrective actions on your pipeline. Based on our review of the documentation you provided, it has been determined that you have complied with the terms of this Order. Accordingly, this case is now closed and no further action is contemplated with respect to the matters involved in this case. Thank you for your cooperation in this matter. Sincerely, Linda Daugherty Director, Central Region Pipeline and Hazardous Materials Safety Administration#
This material provides agency context. It does not replace binding regulatory text, and its legal effect depends on the underlying authority and facts.