CPF 320111018H
CPF 320111018H
case documentOfficial PDF320111018H_CAO_11172011.pdf#
case documentOfficial PDF320111018H_CAO_11172011_text.pdf#
320111018H_Closure Letter_04012016_text.pdf, page 1Official PDFCERTIFIED MAIL - RETURN RECEIPT REQUESTED April 1, 2016 Mr. Gary Buchler Chief Operating Officer (COO) Natural Gas Pipelines Group Tennessee Gas Pipeline Company 1001 Louisiana Street Suite 1000 Houston, Texas 77002 CPF 3-2011-1018H Dear Mr. Buchler: On November 17, 2011, the Pipeline and Hazardous Materials Safety Administration (PHMSA) issued to Tennessee Gas Pipeline Company a Corrective Action Order (Order) in the above-referenced case. This Order included required actions to be taken on and along your pipeline. Based on our review of the documentation you provided, it has been determined that you have complied with the terms of this Order. Accordingly, this case is now closed. Thank you for your cooperation in this matter. Sincerely, Allan C. Beshore Director, Central Region, OPS Pipeline and Hazardous Materials Safety Administration#
This material provides agency context. It does not replace binding regulatory text, and its legal effect depends on the underlying authority and facts.