CPF 320141001M
CPF 320141001M
case documentOfficial PDF320141001M_NOA_02122014.pdf#
case documentOfficial PDF320141001M_NOA_02122014_text.pdf#
party submissionOfficial PDF320141001M_Operator Response to Notice_03102014.pdf#
320141001M_Closure Letter_06102016_text.pdf, page 1Official PDFCERTIFIED MAIL - RETURN RECEIPT REQUESTED June 10, 2016 Mr. Kevin Rumbelow Vice President & Chief Operating Officer AmeriGas Propane, LP 460 North Gulph Road King of Prussia, Pennsylvania 19406 CPF 3-2014-1001M Dear Mr. Rumbelow: On October 24, 2012, a representative from the Pipeline and Hazardous Materials Safety Administration (PHMSA), pursuant to chapter 601 of 49 United States Code, conducted an on- site pipeline safety inspection of AmeriGas Propane, LP, procedures via webinar. As a result of the inspection, AmeriGas Propane, LP was issued a Notice of Amendment on February 12, 2014, which proposed amendment of your procedures. AmeriGas Propane, LP, submitted its amended procedures. My staff reviewed the amended procedures, and it appears that the inadequacies outlined in this Notice of Amendment have been corrected. This letter is to inform you no further action is necessary and this case is now closed. Thank you for your cooperation. Sincerely, Allan C. Beshore Director, Central Region, OPS Pipeline and Hazardous Materials Safety Administration#
This material provides agency context. It does not replace binding regulatory text, and its legal effect depends on the underlying authority and facts.