CPF 32024053NOPV
CPF 32024053NOPV
party submissionOfficial PDF32024053NOPV_Operator Response to Notice_01102025_(22-233381).pdf#
case documentOfficial PDF32024053NOPV_PCO_12122024_(22-233381).pdf#
case documentOfficial PDF32024053NOPV_PCO_12122024_(22-233381)_text.pdf#
32024053NOPV_Closure Letter_12172025_(22-233381)_text.pdf, page 1Official PDFU.S. Department of Transportation Pipeline and Hazardous Materials Safety 901 Locust Street, Suite 480 Kansas City, MO 64106 VIA ELECTRONIC MAIL TO: SBurrows@Pembina.com; Bbachmeier@Pembina.com; jfinch@pembina.com December 17, 2025 Mr. Scott Burrows President and CEO Aux Sable Liquid Products 4000, 585-8 Avenue SW Calgary, AB Canada T2P 1G1 RE: CPF 3-2024-053-NOPV Dear Mr. Burrows: On March 24, 2025, the Pipeline and Hazardous Materials Safety Administration (PHMSA) issued to Aux Sable Liquid Products (ASLP) a Final Order, pursuant to 49 CFR §190.213, in the above- referenced case. This Order included a Compliance Order. Based on our review of the documentation provided, it has been determined that ASLP has complied with the terms of this Order. Accordingly, this case is now closed, and no further action is contemplated with respect to the matters involved in this case. Thank you for your cooperation in this matter. Sincerely, David Barrett Acting Director, Central Region, Office of Pipeline Safety Pipeline and Hazardous Materials Safety Administration cc: Mr. Bob Bachmeier, Manager, Regulatory & Environment, ASLP, Bbachmeier@Pembina.com Mr. Jeff Finch, Sr. Advisor, Regulatory, ASLP, jfinch@pembina.com 1#
32024053NOPV_Final Order_03242025_(22-233381)_text.pdf, page 1Official PDFMarch 24, 2025 VIA ELECTRONIC MAIL TO: sburrows@pembina.com Mr. Scott Burrows President & Chief Executive Officer Pembina Pipeline Corporation 4000, 585 – 8th Avenue S.W. Calgary, Alberta, Canada T2P 1G1 Re: CPF No. 3-2024-053-NOPV Dear Mr. Burrows: Enclosed please find the Final Order issued in the above-referenced case. It makes a finding of violation and specifies actions that need to be taken to comply with the pipeline safety regulations. When the terms of the compliance order are completed, as determined by the Director, Central Region, this enforcement action will be closed. Service of the Final Order by e-mail is effective upon the date of transmission and acknowledgement of receipt as provided under 49 C.F.R. § 190.5. Thank you for your cooperation in this matter. Sincerely, for Alan K. Mayberry Associate Administrator for Pipeline Safety Enclosures (Final Order and NOPV) cc: Mr. Gregory Ochs, Director, Central Region, Office of Pipeline Safety#
32024053NOPV_Final Order_03242025_(22-233381)_text.pdf, page 2Mr. Scott Seibert, Manager, Environment, Operations & Compliance U.S., Pembina Pipeline Corp., sseibert@pembina.com Mr. Bob Bachmeier, Manager, Regulatory & Environment, U.S. Operations, Pembina Pipeline Corp., bbachmeier@pembina.com Ms. Sara Schwann, Vice President, Technical Services, Pembina Pipeline Corp., sschwann@pembina.com Mr. Eric Ducherer, Director Asset Integrity, Pembina Pipeline Corp., educherer@pembina.com Ms. Heather Christie-Burns, Vice President, Transmission Pipelines, Pembina Pipeline Corp., hcburns@pembina.com Mr. Ian Hunt, Director, Operations, Pembina Pipeline Corp., ihunt@pembina.com Mr. Jeff Finch, Sr. Advisor, Regulatory Pembina U.S., Pembina Pipeline Corp., jfinch@pembina.com#
32024053NOPV_Final Order_03242025_(22-233381)_text.pdf, page 3U.S. DEPARTMENT OF TRANSPORTATION PIPELINE AND HAZARDOUS MATERIALS SAFETY ADMINISTRATION OFFICE OF PIPELINE SAFETY WASHINGTON, D.C. 20590 In the Matter of ) ) ) Aux Sable Liquid Products, ) a joint venture of Pembina Pipeline Corporation, Respondent. ) ) ) ) CPF No. 3-2024-053-NOPV FINAL ORDER On December 12, 2024, pursuant to 49 C.F.R. § 190.207, the Director, Central Region, Office of Pipeline Safety (OPS), issued a Notice of Probable Violation (Notice) to Aux Sable Liquid Products (Respondent). Respondent is a joint venture company, and its assets are operated by Pembina Pipeline Corporation. The Notice proposed finding that Respondent had violated the pipeline safety regulations in 49 C.F.R. Part 195. The Notice also proposed certain measures to correct the violation. Respondent did not contest the allegation of violation or corrective measures. Based upon a review of all of the evidence, pursuant to § 190.213, I find Respondent violated the pipeline safety regulation listed below, as more fully described in the enclosed Notice, which is incorporated by reference: 49 C.F.R. § 195.452(j)(2) (Item 1) ─ Respondent failed to complete continual evaluation of its liquid pipeline system, including its pipeline facilities, affecting high consequence areas in order to verify risk factors on at least an annual basis not to exceed 15 months. This finding of violation will be considered a prior offense in any subsequent enforcement action taken against Respondent. Compliance Actions Pursuant to 49 U.S.C. § 60118(b) and 49 C.F.R. § 190.217, Respondent is ordered to take the actions proposed in the enclosed Notice to correct the violation. The Director may grant an extension of time to comply with any of the required items upon a written request timely submitted by the Respondent and demonstrating good cause for an extension. Upon completion of the ordered actions, Respondent may request that the Director close the case. Failure to comply with this Order may result in the assessment of civil penalties under 49 C.F.R. § 190.223#
32024053NOPV_Final Order_03242025_(22-233381)_text.pdf, page 4or in referral to the Attorney General for appropriate relief in a district court of the United States. The terms and conditions of this order are effective upon service in accordance with 49 C.F.R. § 190.5. for Alan K. Mayberry Associate Administrator for Pipeline Safety Date Issued#
This material provides agency context. It does not replace binding regulatory text, and its legal effect depends on the underlying authority and facts.