420045003_Final Order_08242004.pdf, page 1Official PDFo U S. Deoortmenl of Tronsportotion Reseorch ond Speciol Progroms Adminiiirolion 400 Seventh Sl.. S.W Washrngtbn. D C 20590 AUG 2 4 2|lA4 Mr. Jeffrey Hernmer Vice President Equistar Pipeline Operations l22l McKinney One Houston Center Houston, TX 77010 RE: CPF No. 4-2004-5003 DearMr. Hemmer: Enclosed is the Final Order issued by the Associate Administrator for Pipeline Safety in the above-referenced case. It makes a finding of violation and assesses a civil penalty of $25,000. The penaltypaynent terms are set forth in the Final Order. This enforcement action closes automatically upon payment. Your receipt of the Final Order constitutes seruice of that document under 49 C.F.R. $ 1e0.5. Sincerely, t\ t,r A-^- VW---- U James Reynolds Pipeline Compliance Registry Office of Pipeline Safety Enclosure Mr. R. M. Seeley, Director, OPS Southwest Region CERTIFIED MAIL - RETLTRN RECEIPT REOUESTED#
420045003_Final Order_08242004.pdf, page 2DEPARTMENT OF' TRANSPORTATION RESEARCH AND SPECIAL PROGRAMS ADMINISTRATION OFFICE OF PIPELINE SAF'ETY WASHINGTON. DC 20590 In the Matter of Equistar Pipeline Operations, Respondent. ) ) ) ) ) CPFNo. 4-2004-5003 FINAL ORDER Onluly22-25 and December 15, 2003, pursuant to 49 U.S.C. $ 601 17, arepresentative ofthe Office of Pipeline Safety (OPS) conducted an on-site pipeline safety inspection of Respondent's facilities and records for its Lake Charles, Louisiana to Orange, Texas 6-inch ethylene pipeline system. As aresult ofthe inspection, theDirector, SouthwestRegion, OPS, issued to Respondent, byletterdated March 3, 2004, a Notice of Probable Violation and Proposed Civil Penalty (Notice). Ir accordance with 49 C.F.R. $ 190.207, the Notice proposed finding that Respondent had violated 49 C.F.R. 8195.404 and proposed assessing a civil penalty of $25,000 for the alleged violation. The Notice also warned Respondent to take appropriate corrective action. Respondent responded to the Notice by letter dated April 2, 2004 (Response). Respondent contested the allegation ofviolation, offered information to explain the allegations and requested that the proposed civil penalty be eliminated. Respondent did not request a hearing, and therefore has waived the rieht to one. F'INDINGS OFVIOLATION TheNoticeallegedthatRespondentviolated49C.F.R. $l95.404bynotmaintainingdailyoperating records that indicate the discharge pressure at its Lake Charles to Orange 6-inch ethylene pipeline system. ThepreviousOPSinspectionwasconductedonMarchT2,l999. AtthetimeoftheJrly22- 25,2003 OPS inspection, Respondent did not provide pump discharge pressure records for the period of March 13, 1999 thru the date the plant was shut down, on or about February 17,2001 In response, Respondent argued that the pressure records were to be on file for at least the past tJuee years and that Respondent was required to have and provided records from Jaly.22,2000 until the date of the 2003 inspection. Respondent advised that at the time of the inspection, its SCADA system was configured to only retain 3 months of data. Subsequently, Respondent reconfigured its SCADA historical database to save pump discharge pressures for a period of four years. Respondent further advised that it had hard copies of high and .low pressure alarm records from its SCADA#
420045003_Final Order_08242004.pdf, page 32 system event logger for the period from February 17 ,2001 to July 22,2000. Respondent argued that the SCADA alarm system continuously updates and documents any pressure spikes on the system and that no alarms occured that meet this criteria. In support of its position, Respondent submitted a graph that it contends documents alarms recorded during the time period in question which indicates operation within permissible pressure limits. It is Respondent's contention that it has the records from March 1999 to late 2000/early 2001. At the time of the inspection, July 22-25 and December 15,2003, Respondent did not provide discharge pressure records ofits Lake Charles to Orange 6-inch ethylene pipeline for the period betweenMarchl3,l999andthedatetheplantwasshutdown.49C.F.R.$195.404(b)(1)provi that each operator shall maintain for at least three years daily operating records that indicate the discharge pressure at each pump station. "At least three years" is the minimal amount oftime these records are to be kept. Furthermore, the graph of alarm records submitted by Respondent for the period in question, are not a sufficient pressure history and fail to meet the requirements of 49 C.F.R. $195.404. Without the required documentation it is difficult for an operator to ensure that the pipeline system is functioning properly. Without this history, an operator increases the risk ofharm to its persorurel and the public. Documentation is essential to provide the Operator a useful review tool for operating practices and procedures. Accordingly, I find that Respondent's did not maintain daily operating records of discharge pressure, as required by 49 C.F.R. $195.404. This finding of violation will be considered a prior offense in any subsequent enforcement action taken against Respondent. ASSESSMENT OF'PENALTY Under 49 U.S.C. S 60122, Respondent is subject to a civil penalty not to exceed $100,000 per violation for each day of the violation up to a maximum of $ 1 ,000,000 for any related series of violations. The Notice proposed a $25,000 civil penalty for violation of 49 C.F.R. $ 195.404. 49 U.S.C. 5 60122 and 49 C.F.R. $ 190.225 require that, in determining the amount of the civil penalty, I consider the following criteria: nature, circumstances, and gravity of the violation, degree of Respondent's culpability, history of Respondent's prior offenses, Respondent's ability to pay the penalty, good faith by Respondent in attempting to achieve compliance, the effect on Respondent's ability to continue in business, and such other matters as justice may require. The Notice proposed a civil penalty of$25,000, as Respondent failed to have daily operating records that indicate the discharge pressure at its Lake Charles to Orange 6-inch ethylene pipeline system from the date of the last inspection, March 13, 1999, until the date the plant was shut down. In response to the Notice and in suppod of its position, Respondent argued it provided records for the past tlree years as required by regulation and argued that the proposed $25,000 civil penalty should be withdrawn, as it provided high and low pressure alarm records from its SCADA system event#
420045003_Final Order_08242004.pdf, page 43 logger as documentation ofdischarge pressures. Respondent is incorrect in its assertion that it is only required to maintain records that go back for three years. Respondent is required to maintain records for a minimum of three years and SCADA alarm documents during the time period in question fail to satisfy 49 C.F.R. $ 195.404. Respondent failed to maintain sufficient pressure history records. Respondent has not provided any evidence that would justifu mitigation of the proposed civil penalty. Accordingly, having reviewed the record and considered the assessment criteria, I assess Respondent a civil penalty of $25,000, for violation of 49 c.F.R. $195.404. Payment of the civil penalty must be made within 20 days of service. Federal regulations (49 C.F.R. $ 89.21(bX3)) require this paynent may be made by wire transfer, through the Federal Reserve Communications System (Fedwire), to the account ofthe U.S. Treasury. Detailed instructions are contained in the enclosure. Questions conceming wire transfers should be directed to: Financial Operations Division (AMZ-120I), Federal Aviation Administration, Mike Monroney Aeronautica! Center, P.O. Box 25082, Oklahoma City, OK 73125; (405) 954-8893. Failure to pay the $25,000 civil penalty will result in accrual of interest at the current annual rate in accordancewith3l U.S.C. 53717,3 I C.'F.R. $ 901.9and49C.F.R. $ 89.23. Pursuanttothosesame authorities, a late penalty charge of six percent (6%) per annum will be charged if payment is not made within 1 10 days of service. Furthermore, failure to pay the civil penalty may result in referral of the matter to the Attorney General for appropriate action in an United States District Court. WARNINGITEMS The Notice did not propose a civil penalty or compliance action for this item in the Notice; therefore, this is considered a warning item. Respondent is warned that if it does not take appropriate action to correct this item, enforcement action will be taken if a subsequent inspection reveals a violation. Item 2 in the Notice alleged that Respondent failed to provide records to demonstrate that it inspected a five-foot section ofpipe for internal conosion when it was removed in 2002, as required by 49 C.F.R. $ 195.579. When pipe is removed ftom a pipeline, the operator must inspect the internal surface of the pipe for evidence of corrosion. In accordance with 49 C.F.R. $ 195.585, if internal corrosion that requires corective action is found, the operator must investigate circumferentially and longitudinally beyond the removed pipe to determine whether additional corrosion requiring remedial action exists in the area of the removed pipe. Under 49 C.F.R. $ 190.215, Respondent has a right to petition for reconsideration of this Final Order. The petition must be received within 20 days ofRespondent's receipt ofthis Final Order and must contain a brief statement of the issue(s). The filing of a petition automatically stays the#
420045003_Final Order_08242004.pdf, page 54 payment of any civil penalty assessed. All other terms ofthe order, including anyrequired corrective action, shall remain in full effect unless the Associate Administrator, upon written request, grants a stay. The terms and conditions of this Final Order are effective upon receipt. AU0 2 4 :'004 Date Issued Associate Administrator for Pipeline Safety o#