CPF 420115002M
CPF 420115002M
case documentOfficial PDF420115002M_NOA_01272011.pdf#
case documentOfficial PDF420115002M_NOA_01272011_text.pdf#
party submissionOfficial PDF420115002M_Operator Response to NOA_02182011.pdf#
420115002M_Closure_04042011_text.pdf, page 1Official PDFCERTIFIED MAIL - RETURN RECEIPT REQUESTED April 4, 2011 Mr. Tim Reichwein Vice President Operations PB Energy Storage Services, Inc 16285 Park Ten Place Houston, Texas 77084 CPF 4-2011-5002M Dear Mr. Reichwein: On October 4-7, 2010, representatives of the Pipeline and Hazardous Materials Safety Administration (PHMSA) inspected PB Energy Storage Services Inc. Integrity Management Program. As a result of the inspection, PBE was issued a Notice of Amendment on January 27, 2011. This Notice proposed amendment of your procedures to assure safe operation of your pipeline facilities. PBE submitted its amended procedures on February 21, 2011. My staff reviewed the amended procedures, and it appears that the inadequacies outlined in this Notice of Amendment have been corrected. This letter is to inform you no further action is necessary and this case is now closed. Thank you for your cooperation. Sincerely, R. M. Seeley Director, Southwest Region Pipeline and Hazardous Materials Safety Administration#
This material provides agency context. It does not replace binding regulatory text, and its legal effect depends on the underlying authority and facts.