CPF 420115014M
CPF 420115014M
case documentOfficial PDF420115014M_NOA_08172011.pdf#
case documentOfficial PDF420115014M_NOA_08172011_text.pdf#
party submissionOfficial PDF420115014M_Operator Response to NOA_09162011.pdf#
420115014M_Closure Letter_12132011_text.pdf, page 1Official PDFCERTIFIED MAIL - RETURN RECEIPT REQUESTED December 13, 2011 Mr. Bill Boyer President Centurion Pipeline L.P. 5 Greenway Plaza, Suite 100 Houston, TX 77046 CPF 4-2011-5014M Dear Mr. Boyer: In October 2010, representatives of the Pipeline and Hazardous Materials Safety Administration (PHMSA) pursuant to Chapter 601 of 49 United States Code inspected Centurion Pipeline LP in Slaughter, TX. As a result of the inspection, Centurion was issued a Notice of Amendment on August 17, 2011. This Notice proposed amendment of your procedures to assure safe operation of your pipeline facilities. Centurion initially submitted its amended procedures on October 20, 2011. PHMSA requested additional revisions and Centurion resubmitted revised procedures at a meeting with PHMSA on December 8, 2011. My staff has reviewed the amended procedures, and the inadequacies outlined in this Notice of Amendment have been corrected. This letter is to inform you no further action is necessary and this case is now closed. Thank you for your cooperation. Sincerely, R. M. Seeley Director, Southwest Region Pipeline and Hazardous Materials Safety Administration#
This material provides agency context. It does not replace binding regulatory text, and its legal effect depends on the underlying authority and facts.