CPF 420145029M
CPF 420145029M
case documentOfficial PDF420145029M_NOA_11102014.pdf#
case documentOfficial PDF420145029M_NOA_11102014_text.pdf#
party submissionOfficial PDF420145029M_Operator Response to Notice_12152014.pdf#
420145029M_Closure_04142015_text.pdf, page 1Official PDFCERTIFIED MAIL - RETURN RECEIPT REQUESTED April 14, 2015 Mr. William Moyer President Centurion Pipeline, L.P. 5 Greenway Plaza, Suite 110 Houston, TX 77046 CPF 4-2014-5029M Dear Mr. Moyer: From April 2013 to February 2014, representatives of the Pipeline and Hazardous Materials Safety Administration (PHMSA) pursuant to Chapter 601 of 49 United States Code inspected the Centurion Pipeline, L.P. (Centurion) procedures for Operations and Maintenance, and Integrity Management Plan in Houston, TX. As a result of the inspection, Centurion was issued a Notice of Amendment on November 10, 2014, which proposed amendment of your procedures. Centurion submitted the requested procedural modification on December 15, 2014. The submittal was received in my office on December 16, 2014. My staff reviewed the amended procedure, and the inadequacies outlined in this Notice of Amendment have been corrected. This letter is to inform you no further action is necessary and this case is now closed. Thank you for your cooperation. Sincerely, R. M. Seeley Director, Southwest Region Pipeline and Hazardous Materials Safety Administration#
This material provides agency context. It does not replace binding regulatory text, and its legal effect depends on the underlying authority and facts.