CPF 420193003
CPF 420193003
party submissionOfficial PDF420193003_ Operator Response to Notice_10032019.pdf#
case documentOfficial PDF420193003_NOPV PCO_09112019.pdf#
case documentOfficial PDF420193003_NOPV PCO_09112019_text.pdf#
420193003_Closure Letter_05062020_text.pdf, page 1Official PDFELECTRONIC MAIL- RETURN RECEIPT REQUESTED May 6, 2020 Michael S. Smith Chairman and Chief Executive Officer Freeport LNG Development, LP 333 Clay Street, Suite 5050 Houston, Texas 77002 CPF 4-2019-3003 Dear Mr. Smith: On January 14, 2020, the Pipeline and Hazardous Materials Safety Administration (PHMSA) issued to Freeport LNG Development, L.P. (FLNG) a Final Order in the above-referenced case. This Order included a Compliance Order. Based on our review of the documentation you provided, it has been determined that you have complied with the terms of this Order. Accordingly, this case is now closed and no further action is contemplated with respect to the matters involved in this case. Thank you for your cooperation in this matter. Sincerely, Mary L. McDaniel, P.E. Director, Southwest Region Pipeline and Hazardous Materials Safety Administration Cc: Mark Mallett, Vice President of Operations and Engineering, Freeport LNG Development#
420193003_Final Order_01142020_text.pdf, page 1Official PDFJanuary 14, 2020 Mr. Michael S. Smith Chairman and Chief Executive Officer Freeport LNG Development, LP 333 Clay Street, Suite 5050 Houston, Texas 77002 Re: CPF No. 4-2019-3003 Dear Mr. Smith: Enclosed please find the Final Order issued in the above-referenced case. It makes a finding of violation and specifies actions that need to be taken to comply with the pipeline safety regulations. When the terms of the compliance order are completed, as determined by the Director, Southwest Region, this enforcement action will be closed. Service of the Final Order by certified mail is effective upon the date of mailing, as provided under 49 C.F.R. § 190.5. Thank you for your cooperation in this matter. Sincerely, Alan K. Mayberry Associate Administrator for Pipeline Safety Enclosures (Final Order and NOPV) cc: Ms. Mary L. McDaniel, Director, Southwest Region, Office of Pipeline Safety, PHMSA Mr. Mark W. Mallett, Senior Vice President, Operations and Projects, Freeport LNG Development, LP CERTIFIED MAIL - RETURN RECEIPT REQUESTED#
420193003_Final Order_01142020_text.pdf, page 2U.S. DEPARTMENT OF TRANSPORTATION PIPELINE AND HAZARDOUS MATERIALS SAFETY ADMINISTRATION OFFICE OF PIPELINE SAFETY WASHINGTON, D.C. 20590 ____________________________________ In the Matter of ) Freeport LNG Development, LP, ) CPF No. 4-2019-3003 ) ) ) Respondent. ) ____________________________________) FINAL ORDER On September 11, 2019, pursuant to 49 C.F.R. § 190.207, the Director, Southwest Region, Office of Pipeline Safety (OPS), issued a Notice of Probable Violation (Notice) to Freeport LNG Development, LP (Respondent). The Notice proposed finding that Respondent had violated the pipeline safety regulations in 49 C.F.R. Part 193, proposed certain measures to correct the violation, and also included a warning item. Respondent did not contest the allegation of violation or corrective measures. Based upon a review of all of the evidence, pursuant to § 190.213, I find Respondent violated the pipeline safety regulations listed below, as more fully described in the enclosed Notice, which is incorporated by reference: 49 C.F.R. § 193.2017 (Item 1) ─ Respondent failed to establish and maintain written procedures for four separate tasks required by Part 193. This finding of violation will be considered a prior offense in any subsequent enforcement action taken against Respondent. Pursuant to 49 U.S.C. § 60118(b) and 49 C.F.R. § 190.217, Respondent is ordered to take the actions proposed in the enclosed Notice to correct the violation. The Director may grant an extension of time to comply with any of the required items upon a written request timely submitted by the Respondent and demonstrating good cause for an extension. Upon completion of ordered actions, Respondent may request that the Director close the case. Failure to comply with this Order may result in the assessment of civil penalties under 49 C.F.R. § 190.223 or in referral to the Attorney General for appropriate relief in a district court of the United States. The Notice also alleged another probable violation of Part 193, but did not propose a civil penalty or compliance order for this item. Therefore, this item is considered to be a warning item. The warning was for 49 C.F.R. § 193.2639(b), Respondent’s alleged failure to maintain#
420193003_Final Order_01142020_text.pdf, page 3CPF No. 4-2019-3003 Page 2 records that show the location of cathodically-protected components, neighboring structures bonded to the cathodic-protection system, and corrosion protection equipment. The terms and conditions of this order are effective upon service in accordance with 49 C.F.R. § 190.5. January 14, 2020 ___________________________________ _________________________ Alan K. Mayberry Date Issued Associate Administrator for Pipeline Safety#
This material provides agency context. It does not replace binding regulatory text, and its legal effect depends on the underlying authority and facts.