CPF 42024042NOPV
CPF 42024042NOPV
party submissionOfficial PDF42024042NOPV_Operator Response to Notice_09292024_(23-267234).pdf#
case documentOfficial PDF42024042NOPV_PCO_08292024_(23-267234).pdf#
case documentOfficial PDF42024042NOPV_PCO_08292024_(23-267234)_text.pdf#
42024042NOPV_Closure Letter_05152025_(23-267234)_text.pdf, page 1Official PDFVIA ELECTRONIC MAIL TO: seanlalani@eaglelng.com May 15, 2025 Mr. Sean Lalani President Eagle LNG Partners, LLC Research Forest Lakeside No. 4 2445 Technology Forest Blvd, Suite 500, The Woodlands, TX 77381 RE: CPF 4-2024-042-NOPV Dear Mr. Lalani: On November 13, 2024, the Pipeline and Hazardous Materials Safety Administration (PHMSA) issued Eagle LNG Partners, LLC (Eagle LNG), a Final Order in the above-referenced case. This Order included a Compliance Order. Based on our review of the documentation you provided, it has been determined that Eagle LNG has complied with the terms of this Order. Accordingly, this case is now closed and no further action is contemplated with respect to the matters involved in this case. Thank you for your cooperation in this matter. Sincerely, Bryan Lethcoe Director, Southwest Region, Office of Pipeline Safety Pipeline and Hazardous Materials Safety Administration cc: Tim Robertson, Director, Operations, Eagle LNG Partners, LLC, timrobertson@eaglelng.com#
42024042NOPV_Final Order_11132024_(23-267234)_text.pdf, page 1Official PDFNovember 13, 2024 VIA ELECTRONIC MAIL TO: seanlalani@eaglelng.com Mr. Sean Lalani President Eagle LNG Partners LLC Research Forest Lakeside No. 4 2445 Technology Forest Blvd., Suite 500 The Woodlands, Texas 77381 Re: CPF No. 4-2024-042-NOPV Dear Mr. Lalani: Enclosed please find the Final Order issued in the above-referenced case to Eagle LNG Partners LLC. It makes a finding of violation and specifies actions that need to be taken to comply with the pipeline safety regulations. When the terms of the compliance order are completed, as determined by the Director, Southwest Region, this enforcement action will be closed. Service of the Final Order by e-mail is effective upon the date of transmission and acknowledgement of receipt as provided under 49 C.F.R. § 190.5. Thank you for your cooperation in this matter. Sincerely, Alan K. Mayberry Associate Administrator for Pipeline Safety Enclosures (Final Order and NOPV) cc: Mr. Bryan Lethcoe, Director, Southwest Region, Office of Pipeline Safety, PHMSA Mr. Tim Robertson, Director of Operations, Eagle LNG Partners LLC, timrobertson@eaglelng.com CONFIRMATION OF RECEIPT REQUESTED#
42024042NOPV_Final Order_11132024_(23-267234)_text.pdf, page 2U.S. DEPARTMENT OF TRANSPORTATION PIPELINE AND HAZARDOUS MATERIALS SAFETY ADMINISTRATION OFFICE OF PIPELINE SAFETY WASHINGTON, D.C. 20590 ____________________________________ In the Matter of ) Eagle LNG Partners LLC, ) CPF No. 4-2024-042-NOPV ) ) ) Respondent. ) ___________________________________ ) FINAL ORDER On August 29, 2024, pursuant to 49 C.F.R. § 190.207, the Director, Southwest Region, Office of Pipeline Safety (OPS), issued a Notice of Probable Violation and Proposed Compliance Order (Notice) to Eagle LNG Partners LLC (Respondent).1 The Notice proposed finding that Respondent had violated the pipeline safety regulations in 49 C.F.R. Part 193. The Notice also proposed certain measures to correct the violations. Respondent did not contest the allegations of violation or corrective measures. Based upon a review of all of the evidence, pursuant to § 190.213, I find Respondent violated the pipeline safety regulations listed below, as more fully described in the enclosed Notice, which is incorporated by reference: 49 C.F.R. § 193.2637 (Item 1) ─ Respondent failed to take prompt corrective or remedial action whenever an operator learns by inspection or otherwise that atmospheric, external, or internal corrosion is not controlled as required by this Part 193, Subpart G. These findings of violation will be considered prior offenses in any subsequent enforcement action taken against Respondent. Compliance Actions Pursuant to 49 U.S.C. § 60118(b) and 49 C.F.R. § 190.217, Respondent is ordered to take the actions proposed in the enclosed Notice to correct the violation. The Director may grant an extension of time to comply with any of the required items upon a written request timely submitted by the Respondent and demonstrating good cause for an extension. Upon completion 1 The pipeline inspected is operated by Eagle LNG Partners Jacksonville II, LLC, a subsidiary of Eagle LNG Partners, LLC, https://www.energy.gov/sites/default/files/2023- 01/Eagle%20LNG%20DOE%20Application%20Final.pdf.#
42024042NOPV_Final Order_11132024_(23-267234)_text.pdf, page 3of the ordered actions, Respondent may request that the Director close the case. Failure to comply with this Order may result in the assessment of civil penalties under 49 C.F.R. § 190.223 or in referral to the Attorney General for appropriate relief in a district court of the United States. The terms and conditions of this order are effective upon service in accordance with 49 C.F.R. § 190.5. November 13, 2024 ___________________________________ _________________________ Alan K. Mayberry Date Issued Associate Administrator for Pipeline Safety#
This material provides agency context. It does not replace binding regulatory text, and its legal effect depends on the underlying authority and facts.